Assessment Year | 2015 |
---|---|
Principal Product | Commercial Impressions |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
37,500
ft2
|
Annual Production | 24,000,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $113,408 | 1,917,810 |
kWh
|
$0.059 |
Electricity Demand | $54,838 | 5,017 |
kW-mo/yr
|
$10.93 |
Electricity Fees | $25,556 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $48,079 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $24,531 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $10,332 | $40 |
$8,233
139,540
kWh
|
$2,099
-
kW-mo/yr
|
- | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $7,812 | $11,680 |
$6,227
105,542
kWh
|
$1,585
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,148 | $18,346 |
$4,656
78,915
kWh
|
$2,492
-
kW-mo/yr
|
- | |
04 | 2.7425: Clean or color roof to reduce solar load | $6,858 | $19,974 |
$4,497
76,218
kWh
|
$2,361
-
kW-mo/yr
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $5,588 | $1,080 |
$3,642
61,723
kWh
|
$1,946
-
kW-mo/yr
|
- | |
06 | 2.6218: Turn off equipment when not in use | $5,333 | $3,600 |
$5,333
90,396
kWh
|
- | - | |
07 | 2.3132: Recharge batteries on during off-peak demand periods | $1,181 | $3,140 | - |
$1,181
-
kW-mo/yr
|
- | |
08 | 2.8114: Change rate schedules or other changes in utility service | $898 | $560 | - | - | $898 | |
09 | 2.4221: Install compressor air intakes in coolest locations | $756 | $639 |
$494
8,366
kWh
|
$262
-
kW-mo/yr
|
- | |
10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $608 | $1,660 |
$477
8,093
kWh
|
$131
-
kW-mo/yr
|
- | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $480 | $40 |
$349
5,912
kWh
|
$131
-
kW-mo/yr
|
- | |
12 | 2.7135: Install occupancy sensors | $471 | $663 |
$471
7,991
kWh
|
- | - | |
13 | 2.2511: Insulate bare equipment | $302 | $160 |
$157
2,658
kWh
|
$145
-
kW-mo/yr
|
- | |
14 | 2.7447: Install vinyl strip / high speed / air curtain doors | $222 | $706 |
$143
2,429
kWh
|
$79
-
kW-mo/yr
|
- | |
15 | 2.8123: Pay utility bills on time | $90 | $80 | - | - | $90 | |
TOTAL RECOMMENDED | $48,079 | $62,368 |
$34,679
587,783
kWh
|
$12,412
-
kW-mo/yr
|
$988 | ||
TOTAL IMPLEMENTED | $24,531 | $42,862 |
$17,799
301,693
kWh
|
$5,744
-
kW-mo/yr
|
$988 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs