ITAC Assessment: LE0164
ITAC logo
ITAC Assessment: LE0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Seals
NAICS 332912: Fluid Power Valve and Hose Fitting Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 187
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 5,460
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $198,314 2,717,800
kWh
Electricity Demand $123,151 10,237
kW-mo/yr
Natural Gas $19,500 1,928
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,594 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,136 $150 $3,061
40,658
kWh
$1,075
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $11,194 $4,000 $7,922
105,206
kWh
$3,272
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,205 - $835
11,083
kWh
$370
-
kW-mo/yr
- - -
04 2.2136: Install / repair insulation on steam lines $175 $98 - - $175
-
MMBtu
- -
05 2.8113: Purchase gas directly from a contract gas supplier $5,397 - - - - $5,397 -
06 2.8112: Combine utility meters $864 $3,000 - - - $864 -
07 2.8112: Combine utility meters $3,442 $3,000 - - - $3,442 -
08 2.7111: Reduce illumination to minimum necessary levels $5,379 $149 $4,106
54,534
kWh
$1,153
-
kW-mo/yr
- - $120
09 2.7447: Install vinyl strip / high speed / air curtain doors $9,359 $5,100 - - $9,359
-
MMBtu
- -
10 2.7224: Reduce space conditioning during non-working hours $1,007 $1,050 $1,007
13,381
kWh
- - - -
11 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,436 $2,500 - $14,436
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $56,594 $19,047 $16,931
224,862
kWh
$20,306
-
kW-mo/yr
$9,534
-
MMBtu
$9,703 $120
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs