Assessment Year | 1995 |
---|---|
Principal Product | Steel Tanks |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
92,600
ft2
|
Annual Production | 1,000
ton
|
Production Hrs. Annual | 3,016
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $77,039 | 867,233 |
kWh
|
$0.089 |
Natural Gas | $32,626 | 7,781 |
MMBtu
|
$4.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $15,090 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $13,680 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,620 | $410 |
$6,620
84,115
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,520 | $13,510 |
$6,520
86,166
kWh
|
- | - | |
03 | 3.8125: Remove rollers from the machines and clean in a closed solvent cleaner | $1,070 | $1,000 | - | $760 | $310 | |
04 | 2.4133: Use most efficient type of electric motors | $540 | $1,130 |
$540
8,499
kWh
|
- | - | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $340 | $220 |
$340
9,672
kWh
|
- | - | |
TOTAL RECOMMENDED | $15,090 | $16,270 |
$14,020
188,452
kWh
|
$760 | $310 | ||
TOTAL IMPLEMENTED | $13,680 | $15,050 |
$13,680
178,780
kWh
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs