ITAC Assessment: CO0338
ITAC logo
ITAC Assessment: CO0338
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Steel Tanks
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 92,600
ft2
Annual Production 1,000
ton
Production Hrs. Annual 3,016
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,039 867,233
kWh
Natural Gas $32,626 7,781
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,680

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,620 $410 $6,620
84,115
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,520 $13,510 $6,520
86,166
kWh
- -
03 3.8125: Remove rollers from the machines and clean in a closed solvent cleaner $1,070 $1,000 - $760 $310
04 2.4133: Use most efficient type of electric motors $540 $1,130 $540
8,499
kWh
- -
05 2.6231: Utilize controls to operate equipment only when needed $340 $220 $340
9,672
kWh
- -
TOTAL RECOMMENDED $15,090 $16,270 $14,020
188,452
kWh
$760 $310
TOTAL IMPLEMENTED $13,680 $15,050 $13,680
178,780
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs