Assessment Year | 2014 |
---|---|
Principal Product | Flower Bouquets |
NAICS | 453110: Florists |
SIC | 5992: Florists |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
40,000
ft2
|
Annual Production | 450,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,572 | 3,427,920 |
kWh
|
$0.046 |
Electricity Demand | $73,036 | 5,913 |
kW-mo/yr
|
$12.35 |
Electricity Fees | $52,138 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $219,658 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $134,262 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3192: Use fossil fuel powered generator during peak demand periods | $27,195 | $1,120 | - | - | - | $27,195 | - | |
02 | 2.7425: Clean or color roof to reduce solar load | $28,983 | $9,620 |
$21,203
458,374
kWh
|
$7,780
-
kW-mo/yr
|
- | - | - | |
03 | 3.8132: Use less toxic and volatile solvent substitutes | $24,961 | $480 | - | - | - | - | $24,961 | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $24,870 | $12,900 |
$18,201
393,453
kWh
|
$6,669
-
kW-mo/yr
|
- | - | - | |
05 | 2.7444: Close holes and openings in building such as broken windows | $24,844 | $820 |
$18,175
392,894
kWh
|
$6,669
-
kW-mo/yr
|
- | - | - | |
06 | 3.5313: Increase amount of waste recovered for resale | $20,044 | $640 | - | - | - | $20,044 | - | |
07 | 2.7496: Install partitions to reduce size of conditioned space | $16,496 | $160 |
$12,049
261,928
kWh
|
$4,447
-
kW-mo/yr
|
- | - | - | |
08 | 2.2437: Recover waste heat from equipment | $11,171 | $9,500 |
$8,207
177,422
kWh
|
$2,964
-
kW-mo/yr
|
- | - | - | |
09 | 3.4159: Replace treated water with well / surface water | $8,527 | $17,000 | - | - |
$8,527
-
Tgal
|
- | - | |
10 | 2.4322: Use or replace with energy efficient substitutes | $6,636 | $7,480 |
$4,858
105,015
kWh
|
$1,778
-
kW-mo/yr
|
- | - | - | |
11 | 3.6192: Use a less expensive method of waste removal | $5,236 | $320 |
$2,497
53,956
kWh
|
$914
-
kW-mo/yr
|
- | $1,825 | - | |
12 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,968 | $3,309 |
$3,634
78,649
kWh
|
$1,334
-
kW-mo/yr
|
- | - | - | |
13 | 2.4221: Install compressor air intakes in coolest locations | $3,304 | $5,640 |
$2,415
52,203
kWh
|
$889
-
kW-mo/yr
|
- | - | - | |
14 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,624 | $2,320 |
$1,920
41,496
kWh
|
$704
-
kW-mo/yr
|
- | - | - | |
15 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,303 | $1,260 |
$1,685
36,435
kWh
|
$618
-
kW-mo/yr
|
- | - | - | |
16 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,306 | $10,640 |
$1,688
36,691
kWh
|
$618
-
kW-mo/yr
|
- | - | - | |
17 | 2.4222: Install adequate dryers on air lines to eliminate blowdown | $1,975 | $140 |
$1,444
31,215
kWh
|
$531
-
kW-mo/yr
|
- | - | - | |
18 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,758 | $80 |
$1,289
27,867
kWh
|
$469
-
kW-mo/yr
|
- | - | - | |
19 | 2.6127: Maintain air filters by cleaning or replacement | $1,375 | $347 |
$1,006
21,749
kWh
|
$369
-
kW-mo/yr
|
- | - | - | |
20 | 2.2511: Insulate bare equipment | $82 | $92 |
$60
1,299
kWh
|
$22
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $219,658 | $83,868 |
$100,331
2,170,646
kWh
|
$36,775
-
kW-mo/yr
|
$8,527
-
Tgal
|
$49,064 | $24,961 | ||
TOTAL IMPLEMENTED | $134,262 | $43,096 |
$59,044
1,278,152
kWh
|
$21,686
-
kW-mo/yr
|
$8,527
-
Tgal
|
$20,044 | $24,961 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs