Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Flower Bouquets
NAICS 453110: Florists
SIC 5992: Florists
Sales Range $100
M
to 500
M
# of Employees 200
Plant Area 40,000
ft2
Annual Production 450,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,572 3,427,920
kWh
Electricity Demand $73,036 5,913
kW-mo/yr
Electricity Fees $52,138 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $219,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $134,262

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3192: Use fossil fuel powered generator during peak demand periods $27,195 $1,120 - - - $27,195 -
02 2.7425: Clean or color roof to reduce solar load $28,983 $9,620 $21,203
458,374
kWh
$7,780
-
kW-mo/yr
- - -
03 3.8132: Use less toxic and volatile solvent substitutes $24,961 $480 - - - - $24,961
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $24,870 $12,900 $18,201
393,453
kWh
$6,669
-
kW-mo/yr
- - -
05 2.7444: Close holes and openings in building such as broken windows $24,844 $820 $18,175
392,894
kWh
$6,669
-
kW-mo/yr
- - -
06 3.5313: Increase amount of waste recovered for resale $20,044 $640 - - - $20,044 -
07 2.7496: Install partitions to reduce size of conditioned space $16,496 $160 $12,049
261,928
kWh
$4,447
-
kW-mo/yr
- - -
08 2.2437: Recover waste heat from equipment $11,171 $9,500 $8,207
177,422
kWh
$2,964
-
kW-mo/yr
- - -
09 3.4159: Replace treated water with well / surface water $8,527 $17,000 - - $8,527
-
Tgal
- -
10 2.4322: Use or replace with energy efficient substitutes $6,636 $7,480 $4,858
105,015
kWh
$1,778
-
kW-mo/yr
- - -
11 3.6192: Use a less expensive method of waste removal $5,236 $320 $2,497
53,956
kWh
$914
-
kW-mo/yr
- $1,825 -
12 2.7447: Install vinyl strip / high speed / air curtain doors $4,968 $3,309 $3,634
78,649
kWh
$1,334
-
kW-mo/yr
- - -
13 2.4221: Install compressor air intakes in coolest locations $3,304 $5,640 $2,415
52,203
kWh
$889
-
kW-mo/yr
- - -
14 2.7142: Utilize higher efficiency lamps and/or ballasts $2,624 $2,320 $1,920
41,496
kWh
$704
-
kW-mo/yr
- - -
15 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,303 $1,260 $1,685
36,435
kWh
$618
-
kW-mo/yr
- - -
16 2.7142: Utilize higher efficiency lamps and/or ballasts $2,306 $10,640 $1,688
36,691
kWh
$618
-
kW-mo/yr
- - -
17 2.4222: Install adequate dryers on air lines to eliminate blowdown $1,975 $140 $1,444
31,215
kWh
$531
-
kW-mo/yr
- - -
18 2.4231: Reduce the pressure of compressed air to the minimum required $1,758 $80 $1,289
27,867
kWh
$469
-
kW-mo/yr
- - -
19 2.6127: Maintain air filters by cleaning or replacement $1,375 $347 $1,006
21,749
kWh
$369
-
kW-mo/yr
- - -
20 2.2511: Insulate bare equipment $82 $92 $60
1,299
kWh
$22
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $219,658 $83,868 $100,331
2,170,646
kWh
$36,775
-
kW-mo/yr
$8,527
-
Tgal
$49,064 $24,961
TOTAL IMPLEMENTED $134,262 $43,096 $59,044
1,278,152
kWh
$21,686
-
kW-mo/yr
$8,527
-
Tgal
$20,044 $24,961
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs