ITAC Assessment: MI0264
ITAC logo
ITAC Assessment: MI0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 100,000
ft2
Annual Production 20
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $272,494 2,889,644
kWh
Electricity Demand $56,597 8,194
kW-mo/yr
Electricity Fees $41,482 -
LPG $5,031 150
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,572 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $62,577

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $30,260 $87,618 $26,966
286,872
kWh
$3,294
-
kW-mo/yr
- - - -
02 3.8132: Use less toxic and volatile solvent substitutes $15,579 $320 - - - - - $15,579
03 2.7134: Use photocell controls $15,757 $840 $12,752
135,660
kWh
$3,005
-
kW-mo/yr
- - - -
04 2.7145: Install skylights $12,707 $1,600 $12,707
133,062
kWh
- - - - -
05 2.8114: Change rate schedules or other changes in utility service $8,739 $2,100 - - - - $8,739 -
06 2.7221: Lower temperature during the winter season and vice-versa $8,019 $80 $6,238
66,366
kWh
$1,781
-
kW-mo/yr
- - - -
07 3.5313: Increase amount of waste recovered for resale $7,073 $1,000 - - - $7,073
-
lb
- -
08 2.4222: Install adequate dryers on air lines to eliminate blowdown $5,408 $140 $4,836
51,447
kWh
$572
-
kW-mo/yr
- - - -
09 2.2437: Recover waste heat from equipment $5,031 $140 - - $5,031
-
MMBtu
- - -
10 2.4239: Eliminate or reduce compressed air usage $4,344 $4,800 $3,888
41,357
kWh
$456
-
kW-mo/yr
- - - -
11 2.7425: Clean or color roof to reduce solar load $2,707 $3,170 $2,422
25,765
kWh
$285
-
kW-mo/yr
- - - -
12 2.6127: Maintain air filters by cleaning or replacement $2,115 $520 $1,894
20,149
kWh
$221
-
kW-mo/yr
- - - -
13 2.7447: Install vinyl strip / high speed / air curtain doors $1,870 $2,960 - - $1,870
-
MMBtu
- - -
14 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,886 $1,660 $1,688
17,959
kWh
$198
-
kW-mo/yr
- - - -
15 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,646 $1,660 $1,473
15,672
kWh
$173
-
kW-mo/yr
- - - -
16 2.4231: Reduce the pressure of compressed air to the minimum required $1,316 $80 $1,178
12,537
kWh
$138
-
kW-mo/yr
- - - -
17 2.4231: Reduce the pressure of compressed air to the minimum required $1,179 $80 $1,055
11,224
kWh
$124
-
kW-mo/yr
- - - -
18 2.7221: Lower temperature during the winter season and vice-versa $1,127 $80 $1,010
10,745
kWh
$117
-
kW-mo/yr
- - - -
19 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $782 $1,660 $699
7,438
kWh
$83
-
kW-mo/yr
- - - -
20 2.7135: Install occupancy sensors $542 $83 $487
5,176
kWh
$55
-
kW-mo/yr
- - - -
21 2.4231: Reduce the pressure of compressed air to the minimum required $485 $80 $437
4,649
kWh
$48
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $128,572 $110,671 $79,730
846,078
kWh
$10,550
-
kW-mo/yr
$6,901
-
MMBtu
$7,073
-
lb
$8,739 $15,579
TOTAL IMPLEMENTED $62,577 $12,540 $48,719
516,178
kWh
$6,785
-
kW-mo/yr
- $7,073
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs