| Assessment Year | 2011 |
|---|---|
| Principal Product | Fruit Juice |
| NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
| SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
| Sales Range | $100 M to 500M |
| # of Employees | 740 |
| Plant Area |
1,000,000
ft2
|
| Annual Production | 80,000
Tgal
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $4,666,822 | 77,902,497 |
kWh
|
$0.060 |
| Electricity Demand | $173,576 | 134,837 |
kW-mo/yr
|
$1.29 |
| Natural Gas | $3,550,432 | 674,530 |
MMBtu
|
$5.26 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $258,520 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $83,606 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $64,568 | $175,700 |
$62,955
912,388
kWh
|
$1,613
-
kW-mo/yr
|
- | |
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $39,559 | $7,338 |
$38,190
553,480
kWh
|
$1,369
-
kW-mo/yr
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $24,805 | $1,320 |
$23,727
343,875
kWh
|
$1,078
-
kW-mo/yr
|
- | |
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $20,342 | $1,350 | - | - |
$20,342
-
MMBtu
|
|
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $18,730 | $26,000 | - | - |
$18,730
-
MMBtu
|
|
| 06 | 2.7425: Clean or color roof to reduce solar load | $18,125 | $133,000 |
$15,370
222,754
kWh
|
$2,755
-
kW-mo/yr
|
- | |
| 07 | 2.6231: Utilize controls to operate equipment only when needed | $17,851 | $20,000 |
$17,406
252,312
kWh
|
$445
-
kW-mo/yr
|
- | |
| 08 | 2.2136: Install / repair insulation on steam lines | $16,463 | $16,554 | - | - |
$16,463
-
MMBtu
|
|
| 09 | 2.2447: Heat water with exhaust heat | $16,131 | $30,000 | - | - |
$16,131
-
MMBtu
|
|
| 10 | 2.7231: Use radiant heater for spot heating | $8,346 | $10,000 |
$8,138
117,936
kWh
|
$208
-
kW-mo/yr
|
- | |
| 11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,145 | $8,889 |
$7,942
115,097
kWh
|
$203
-
kW-mo/yr
|
- | |
| 12 | 2.6218: Turn off equipment when not in use | $5,455 | $2,425 |
$5,375
77,903
kWh
|
$80
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $258,520 | $432,576 |
$179,103
2,595,745
kWh
|
$7,751
-
kW-mo/yr
|
$71,666
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $83,606 | $181,634 |
$60,552
877,565
kWh
|
$4,324
-
kW-mo/yr
|
$18,730
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs