ITAC Assessment: MI0159
ITAC logo
ITAC Assessment: MI0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Medical and Laboratory Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 47,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $525,440 3,335,267
kWh
Electricity Demand $57,841 7,084
kW-mo/yr
Electricity Fees $2,400 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,606 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,731

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $21,617 $120 $19,215
147,086
kWh
$2,402
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,137 $1,210 $6,743
42,800
kWh
$394
-
kW-mo/yr
-
03 2.4323: Use optimum size and capacity equipment $6,615 $3,475 $6,180
39,229
kWh
$435
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,266 $3,978 $4,678
35,808
kWh
$588
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $3,337 $40 $2,994
19,006
kWh
$343
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $3,238 $280 $2,922
18,549
kWh
$316
-
kW-mo/yr
-
07 3.5217: Reuse / recycle/ sell paper products $1,875 $120 - - $1,875
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,521 $480 $1,251
16,465
kWh
$270
-
kW-mo/yr
-
TOTAL RECOMMENDED $50,606 $9,703 $43,983
318,943
kWh
$4,748
-
kW-mo/yr
$1,875
TOTAL IMPLEMENTED $48,731 $9,583 $43,983
318,943
kWh
$4,748
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs