ITAC Assessment: MI0129
ITAC logo
ITAC Assessment: MI0129
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product juice
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 88
Plant Area 38,000
ft2
Annual Production 4,030
Tgal
Production Hrs. Annual 2,990
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,704 1,355,669
kWh
Electricity Demand $34,195 4,230
kW-mo/yr
Electricity Fees $16,047 -
Natural Gas $20,384 1,895
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,216 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,824

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $9,749 $400 $8,115
143,432
kWh
$1,634
-
kW-mo/yr
02 2.7447: Install vinyl strip / high speed / air curtain doors $7,075 $1,410 $5,885
104,019
kWh
$1,190
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,814 $1,074 $1,222
22,497
kWh
$592
-
kW-mo/yr
04 2.6231: Utilize controls to operate equipment only when needed $314 $140 $314
5,773
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $264 $30 $162
2,982
kWh
$102
-
kW-mo/yr
TOTAL RECOMMENDED $19,216 $3,054 $15,698
278,703
kWh
$3,518
-
kW-mo/yr
TOTAL IMPLEMENTED $16,824 $1,810 $14,000
247,451
kWh
$2,824
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs