ITAC Assessment: MI0123
ITAC logo
ITAC Assessment: MI0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Industrial Quilters
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3552: Textile Machinery
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 90,000
ft2
Annual Production 215
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,927 1,722,276
kWh
Electricity Demand $39,277 4,984
kW-mo/yr
Electricity Fees $27,889 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,096 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,099

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $17,833 $56,238 $11,433
200,850
kWh
$6,400
-
kW-mo/yr
- -
02 2.7221: Lower temperature during the winter season and vice-versa $14,670 $84 $10,142
182,277
kWh
$4,528
-
kW-mo/yr
- -
03 2.8121: Apply for tax-free status for energy purchases $3,164 $90 - - - $3,164
04 2.6231: Utilize controls to operate equipment only when needed $2,583 $140 $2,583
46,447
kWh
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,702 $1,018 $1,331
23,936
kWh
$371
-
kW-mo/yr
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $845 $660 $845
15,257
kWh
- - -
07 2.7124: Make a practice of turning off lights when not needed $405 - $252
4,781
kWh
$153
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $403 $335 $403
6,021
kWh
- - -
09 3.2123: Convert to high volume low pressure (hvlp) paint guns $290 $24 $53
946
kWh
$12
-
kW-mo/yr
$225
-
gal
-
10 2.6218: Turn off equipment when not in use $201 - $105
1,916
kWh
$96
-
kW-mo/yr
- -
TOTAL RECOMMENDED $42,096 $58,589 $27,147
482,431
kWh
$11,560
-
kW-mo/yr
$225
-
gal
$3,164
TOTAL IMPLEMENTED $21,099 $2,261 $15,714
281,581
kWh
$5,160
-
kW-mo/yr
$225
-
gal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs