ITAC Assessment: MI0116
ITAC logo
ITAC Assessment: MI0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product OEM lighting devices
NAICS 335931: Current-Carrying Wiring Device Manufacturing
SIC 3643: Current-Carrying Wiring Devices
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 42,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $98,735 1,781,443
kWh
Electricity Demand $33,686 4,250
kW-mo/yr
Electricity Fees $14,446 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,669

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $1,754 $2,512 $1,379
24,239
kWh
$375
-
kW-mo/yr
-
02 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $39,673 $4,275 $29,947
590,205
kWh
$9,726
-
kW-mo/yr
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,648 $1,074 $7,827
137,527
kWh
$1,821
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,032 $56 $1,460
25,642
kWh
$572
-
kW-mo/yr
-
05 2.7111: Reduce illumination to minimum necessary levels $3,307 $47 $2,564
44,640
kWh
$743
-
kW-mo/yr
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,244 $759 $1,740
30,300
kWh
$504
-
kW-mo/yr
-
07 4.821: Pay bills on time to avoid late fees $1,267 - - - $1,267
TOTAL RECOMMENDED $59,925 $8,723 $44,917
852,553
kWh
$13,741
-
kW-mo/yr
$1,267
TOTAL IMPLEMENTED $12,669 $3,586 $9,206
161,766
kWh
$2,196
-
kW-mo/yr
$1,267
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs