Assessment Year | 2017 |
---|---|
Principal Product | Pharmaceuticals |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $100 M to 500M |
# of Employees | 240 |
Plant Area |
580,000
ft2
|
Annual Production | 5,200,000,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $4,434,148 | 28,882,368 |
kWh
|
$0.15 |
Electricity Demand | $462,677 | 51,473 |
kW-mo/yr
|
$8.99 |
Electricity Fees | $35,306 | - |
|
- |
TOTAL YEARLY COSTS | $4,932,131 | |||
RECOMMENDED SAVINGS* | $736,359 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $417,460 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7425: Clean or color roof to reduce solar load | $288,813 | $48,000 |
$267,450
1,736,686
kWh
|
$21,363
-
kW-mo/yr
|
- | - | |
02 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $172,588 | $249,599 | - |
$172,588
-
kW-mo/yr
|
- | - | |
03 | 2.4321: Upgrade obsolete equipment | $120,000 | $42,000 | - | - | - | $120,000 | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $84,550 | $59,400 |
$78,296
508,417
kWh
|
$6,254
-
kW-mo/yr
|
- | - | |
05 | 2.8123: Pay utility bills on time | $29,840 | - | - | - | $29,840 | - | |
06 | 2.8114: Change rate schedules or other changes in utility service | $26,311 | $12,000 | - | - | - | $26,311 | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $14,257 | $1,670 |
$11,740
76,236
kWh
|
$2,517
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $736,359 | $412,669 |
$357,486
2,321,339
kWh
|
$202,722
-
kW-mo/yr
|
$29,840 | $146,311 | ||
TOTAL IMPLEMENTED | $417,460 | $109,070 |
$357,486
2,321,339
kWh
|
$30,134
-
kW-mo/yr
|
$29,840 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs