Assessment Year | 2005 |
---|---|
Principal Product | Soft drink manufacturing |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $50 M to 100M |
# of Employees | 130 |
Plant Area |
180,000
ft2
|
Annual Production | 16,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $311,704 | 6,278,031 |
kWh
|
$0.050 |
Electricity Demand | $134,464 | 16,398 |
kW-mo/yr
|
$8.20 |
Electricity Fees | $47,712 | - |
|
- |
Natural Gas | $192,944 | 20,166 |
MMBtu
|
$9.57 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,730 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $61,700 | $195,000 |
$12,300
246,000
kWh
|
- | - | $40,000 | $9,400 | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,798 | $906 |
$5,912
119,071
kWh
|
$1,558
-
kW-mo/yr
|
- | $(-672.0) | - | |
03 | 2.2437: Recover waste heat from equipment | $2,613 | $6,960 | - | - |
$2,613
-
MMBtu
|
- | - | |
04 | 2.4323: Use optimum size and capacity equipment | $1,062 | $1,536 |
$825
16,618
kWh
|
$237
-
kW-mo/yr
|
- | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $1,001 | $288 |
$1,001
20,163
kWh
|
- | - | - | - | |
06 | 2.7261: Install timers and/or thermostats | $556 | $486 |
$556
11,190
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $73,730 | $205,176 |
$20,594
413,042
kWh
|
$1,795
-
kW-mo/yr
|
$2,613
-
MMBtu
|
$39,328 | $9,400 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs