ITAC Assessment: MI0103
ITAC logo
ITAC Assessment: MI0103
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Soft drink manufacturing
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 180,000
ft2
Annual Production 16,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,704 6,278,031
kWh
Electricity Demand $134,464 16,398
kW-mo/yr
Electricity Fees $47,712 -
Natural Gas $192,944 20,166
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,730 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2622: Replace existing chiller with high efficiency model $61,700 $195,000 $12,300
246,000
kWh
- - $40,000 $9,400
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,798 $906 $5,912
119,071
kWh
$1,558
-
kW-mo/yr
- $(-672.0) -
03 2.2437: Recover waste heat from equipment $2,613 $6,960 - - $2,613
-
MMBtu
- -
04 2.4323: Use optimum size and capacity equipment $1,062 $1,536 $825
16,618
kWh
$237
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,001 $288 $1,001
20,163
kWh
- - - -
06 2.7261: Install timers and/or thermostats $556 $486 $556
11,190
kWh
- - - -
TOTAL RECOMMENDED $73,730 $205,176 $20,594
413,042
kWh
$1,795
-
kW-mo/yr
$2,613
-
MMBtu
$39,328 $9,400
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs