| Assessment Year | 2002 |
|---|---|
| Principal Product | Steel shelving |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $10 M to 50M |
| # of Employees | 62 |
| Plant Area |
110,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $67,485 | 985,440 |
kWh
|
$0.068 |
| Electricity Demand | $30,216 | 3,725 |
kW-mo/yr
|
$8.11 |
| Natural Gas | $76,523 | 73,312 |
MMBtu
|
$1.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $97,675 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $61,673 | $3,000 | n/a | - | - | $61,673 |
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $15,305 | $930 | n/a |
$15,305
429,608
kWh
|
- | - |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,032 | $255 | n/a |
$8,032
116,410
kWh
|
- | - |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,051 | $8 | n/a |
$7,051
102,189
kWh
|
- | - |
| 05 | 3.5131: Recycle white water | $5,465 | $601 | n/a | - |
$5,465
-
Tgal
|
- |
| 06 | 2.2514: Cover open tanks | $149 | $48 | n/a |
$149
2,163
kWh
|
- | - |
| TOTAL RECOMMENDED | $97,675 | $4,842 |
$30,537
650,370
kWh
|
$5,465
-
Tgal
|
$61,673 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Primary Raw Material Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs