Assessment Year | 2002 |
---|---|
Principal Product | Steel shelving |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 62 |
Plant Area |
110,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,485 | 985,440 |
kWh
|
$0.068 |
Electricity Demand | $30,216 | 3,725 |
kW-mo/yr
|
$8.11 |
Natural Gas | $76,523 | 73,312 |
MMBtu
|
$1.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $97,675 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|
01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $61,673 | $3,000 | n/a | - | - | $61,673 |
02 | 2.6231: Utilize controls to operate equipment only when needed | $15,305 | $930 | n/a |
$15,305
429,608
kWh
|
- | - |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,032 | $255 | n/a |
$8,032
116,410
kWh
|
- | - |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,051 | $8 | n/a |
$7,051
102,189
kWh
|
- | - |
05 | 3.5131: Recycle white water | $5,465 | $601 | n/a | - |
$5,465
-
Tgal
|
- |
06 | 2.2514: Cover open tanks | $149 | $48 | n/a |
$149
2,163
kWh
|
- | - |
TOTAL RECOMMENDED | $97,675 | $4,842 |
$30,537
650,370
kWh
|
$5,465
-
Tgal
|
$61,673 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||