ITAC Assessment: CM1021
ITAC logo
ITAC Assessment: CM1021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Wastewater Treatment, Clean Effluent
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 8
Plant Area 114,700
ft2
Annual Production 1,800,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $336,451 5,759,969
kWh
Electricity Demand $165,366 10,765
kW-mo/yr
Electricity Fees $517,670 -
Natural Gas $75,219 5,917
MMBtu
TOTAL YEARLY COSTS $1,094,706
RECOMMENDED SAVINGS* $148,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $90,579 $941,260 $90,579
1,551,010
kWh
- -
02 2.2136: Install / repair insulation on steam lines $2,426 $981 $2,426
33,465
kWh
- -
03 3.1191: Change procedures / equipment / operating conditions $427 $730 $314
5,375
kWh
$113
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,522 $4,636 $1,126
19,253
kWh
$1,396
-
kW-mo/yr
-
05 4.463: Modify facility to avoid excess maintenance costs $18,330 $246,610 - - $18,330
06 2.2622: Replace existing chiller with high efficiency model $34,069 $800 - - $34,069
TOTAL RECOMMENDED $148,353 $1,195,017 $94,445
1,609,103
kWh
$1,509
-
kW-mo/yr
$52,399
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs