ITAC Assessment: MI0438
ITAC logo
ITAC Assessment: MI0438
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Landing Gears
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 220
Plant Area 100,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 7,000
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $484,913 8,869,200
kWh
Electricity Demand $312,033 16,674
kW-mo/yr
Electricity Fees $134,214 -
Natural Gas $18,015 1,155
MMBtu
Waste Disposal Costs
Water Usage $22,834 1,952
Tgal
Water Disposal $28,983 1,952
Tgal
TOTAL YEARLY COSTS $1,000,992
RECOMMENDED SAVINGS* $508,032 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.9114: Use solar heat to make electricty $292,161 $663,964 $80,524
1,464,073
kWh
$211,637
-
kW-mo/yr
- - -
02 2.8114: Change rate schedules or other changes in utility service $116,907 - - - - - $116,907
03 2.7221: Lower temperature during the winter season and vice-versa $52,928 $1,320 $38,107
692,862
kWh
$14,821
-
kW-mo/yr
- - -
04 3.4155: Meter waste water $26,088 $956 - - - $26,088
-
Tgal
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,979 $1,660 $3,771
68,568
kWh
$2,208
-
kW-mo/yr
- - -
06 2.4239: Eliminate or reduce compressed air usage $9,248 $860 $5,841
106,199
kWh
$3,407
-
kW-mo/yr
- - -
07 2.1131: Repair faulty insulation in furnaces, boilers, etc $2,582 $1,027 $884
16,079
kWh
$842
-
kW-mo/yr
$856
-
MMBtu
- -
08 2.2628: Utilize a less expensive cooling method $2,139 $40 $1,351
24,570
kWh
$788
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $508,032 $669,827 $130,478
2,372,351
kWh
$233,703
-
kW-mo/yr
$856
-
MMBtu
$26,088
-
Tgal
$116,907
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs