ITAC Assessment: ME0265
ITAC logo
ITAC Assessment: ME0265
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product CNC Machine Work
NAICS
n/a
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 64,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 5,750
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,205 2,066,237
kWh
Electricity Demand $41,594 4,503
kW-mo/yr
Electricity Fees $12,826 -
LPG $7,970 811
MMBtu
Fuel Oil #2 $5,800 913
MMBtu
Other Gas $5,149 767
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $216,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $162,850 $58,000 n/a - - $(-16,400.0)
-
MMBtu
$179,250
02 2.8121: Apply for tax-free status for energy purchases $22,650 - n/a - - - $22,650
03 2.4133: Use most efficient type of electric motors $6,135 $7,936 n/a $4,917
70,340
kWh
$1,218
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,352 $4,484 n/a $2,923
41,911
kWh
$3,429
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $3,895 $1,275 n/a $3,895
111,372
kWh
- - -
06 4.821: Pay bills on time to avoid late fees $2,388 - n/a - - - $2,388
07 2.2511: Insulate bare equipment $2,916 $2,916 n/a - - $2,916
-
MMBtu
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,720 $1,075 n/a $1,972
26,671
kWh
$940
-
kW-mo/yr
$(-1,192.0)
-
MMBtu
-
09 2.4221: Install compressor air intakes in coolest locations $1,397 $220 n/a $1,397
19,930
kWh
- - -
10 4.821: Pay bills on time to avoid late fees $1,304 - n/a - - - $1,304
11 2.8121: Apply for tax-free status for energy purchases $2,970 - n/a - - - $2,970
12 4.821: Pay bills on time to avoid late fees $331 - n/a - - - $331
13 4.231: Purchase equipment instead of leasing $1,171 - n/a - - - $1,171
TOTAL RECOMMENDED $216,079 $75,906 $15,104
270,224
kWh
$5,587
-
kW-mo/yr
$(-14,676.0)
-
MMBtu
$210,064
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs