Assessment Year | 1999 |
---|---|
Principal Product | CNC Machine Work |
NAICS |
n/a
|
SIC | 3541: Machine Tools, Metal Cutting Types |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
64,000
ft2
|
Annual Production | 4,000,000
lb
|
Production Hrs. Annual | 5,750
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $153,205 | 2,066,237 |
kWh
|
$0.074 |
Electricity Demand | $41,594 | 4,503 |
kW-mo/yr
|
$9.24 |
Electricity Fees | $12,826 | - |
|
- |
LPG | $7,970 | 811 |
MMBtu
|
$9.83 |
Fuel Oil #2 | $5,800 | 913 |
MMBtu
|
$6.35 |
Other Gas | $5,149 | 767 |
MMBtu
|
$6.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $216,079 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $162,850 | $58,000 | n/a | - | - |
$(-16,400.0)
-
MMBtu
|
$179,250 |
02 | 2.8121: Apply for tax-free status for energy purchases | $22,650 | - | n/a | - | - | - | $22,650 |
03 | 2.4133: Use most efficient type of electric motors | $6,135 | $7,936 | n/a |
$4,917
70,340
kWh
|
$1,218
-
kW-mo/yr
|
- | - |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,352 | $4,484 | n/a |
$2,923
41,911
kWh
|
$3,429
-
kW-mo/yr
|
- | - |
05 | 2.2437: Recover waste heat from equipment | $3,895 | $1,275 | n/a |
$3,895
111,372
kWh
|
- | - | - |
06 | 4.821: Pay bills on time to avoid late fees | $2,388 | - | n/a | - | - | - | $2,388 |
07 | 2.2511: Insulate bare equipment | $2,916 | $2,916 | n/a | - | - |
$2,916
-
MMBtu
|
- |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,720 | $1,075 | n/a |
$1,972
26,671
kWh
|
$940
-
kW-mo/yr
|
$(-1,192.0)
-
MMBtu
|
- |
09 | 2.4221: Install compressor air intakes in coolest locations | $1,397 | $220 | n/a |
$1,397
19,930
kWh
|
- | - | - |
10 | 4.821: Pay bills on time to avoid late fees | $1,304 | - | n/a | - | - | - | $1,304 |
11 | 2.8121: Apply for tax-free status for energy purchases | $2,970 | - | n/a | - | - | - | $2,970 |
12 | 4.821: Pay bills on time to avoid late fees | $331 | - | n/a | - | - | - | $331 |
13 | 4.231: Purchase equipment instead of leasing | $1,171 | - | n/a | - | - | - | $1,171 |
TOTAL RECOMMENDED | $216,079 | $75,906 |
$15,104
270,224
kWh
|
$5,587
-
kW-mo/yr
|
$(-14,676.0)
-
MMBtu
|
$210,064 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs