| Assessment Year | 1999 |
|---|---|
| Principal Product | CNC Machine Work |
| NAICS |
n/a
|
| SIC | 3541: Machine Tools, Metal Cutting Types |
| Sales Range | $10 M to 50M |
| # of Employees | 110 |
| Plant Area |
64,000
ft2
|
| Annual Production | 4,000,000
lb
|
| Production Hrs. Annual | 5,750
hrs
|
| Location (State) | Maine |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $153,205 | 2,066,237 |
kWh
|
$0.074 |
| Electricity Demand | $41,594 | 4,503 |
kW-mo/yr
|
$9.24 |
| Electricity Fees | $12,826 | - |
|
- |
| LPG | $7,970 | 811 |
MMBtu
|
$9.83 |
| Fuel Oil #2 | $5,800 | 913 |
MMBtu
|
$6.35 |
| Other Gas | $5,149 | 767 |
MMBtu
|
$6.71 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $216,079 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.111: Add equipment/ operators to reduce production bottleneck | $162,850 | $58,000 | n/a | - | - |
$(-16,400.0)
-
MMBtu
|
$179,250 |
| 02 | 2.8121: Apply for tax-free status for energy purchases | $22,650 | - | n/a | - | - | - | $22,650 |
| 03 | 2.4133: Use most efficient type of electric motors | $6,135 | $7,936 | n/a |
$4,917
70,340
kWh
|
$1,218
-
kW-mo/yr
|
- | - |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,352 | $4,484 | n/a |
$2,923
41,911
kWh
|
$3,429
-
kW-mo/yr
|
- | - |
| 05 | 2.2437: Recover waste heat from equipment | $3,895 | $1,275 | n/a |
$3,895
111,372
kWh
|
- | - | - |
| 06 | 4.821: Pay bills on time to avoid late fees | $2,388 | - | n/a | - | - | - | $2,388 |
| 07 | 2.2511: Insulate bare equipment | $2,916 | $2,916 | n/a | - | - |
$2,916
-
MMBtu
|
- |
| 08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,720 | $1,075 | n/a |
$1,972
26,671
kWh
|
$940
-
kW-mo/yr
|
$(-1,192.0)
-
MMBtu
|
- |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $1,397 | $220 | n/a |
$1,397
19,930
kWh
|
- | - | - |
| 10 | 4.821: Pay bills on time to avoid late fees | $1,304 | - | n/a | - | - | - | $1,304 |
| 11 | 2.8121: Apply for tax-free status for energy purchases | $2,970 | - | n/a | - | - | - | $2,970 |
| 12 | 4.821: Pay bills on time to avoid late fees | $331 | - | n/a | - | - | - | $331 |
| 13 | 4.231: Purchase equipment instead of leasing | $1,171 | - | n/a | - | - | - | $1,171 |
| TOTAL RECOMMENDED | $216,079 | $75,906 |
$15,104
270,224
kWh
|
$5,587
-
kW-mo/yr
|
$(-14,676.0)
-
MMBtu
|
$210,064 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs