ITAC Assessment: DL0147
ITAC logo
ITAC Assessment: DL0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Soft Drinks
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 63,260
ft2
Annual Production 12,000,000
pieces
Production Hrs. Annual 5,800
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $369,786 3,601,122
kWh
Electricity Demand $73,992 11,235
kW-mo/yr
Natural Gas $86,901 13,252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,590 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,150

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,550 $9,700 $8,500
82,500
kWh
$1,050
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,890 $32,055 $12,610
122,400
kWh
$4,280
-
kW-mo/yr
-
03 2.1221: Replace obsolete burners with more efficient ones $27,680 $73,960 - - $27,680
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,470 $21,000 $4,470
43,420
kWh
- -
TOTAL RECOMMENDED $58,590 $136,715 $25,580
248,320
kWh
$5,330
-
kW-mo/yr
$27,680
-
MMBtu
TOTAL IMPLEMENTED $32,150 $94,960 $4,470
43,420
kWh
- $27,680
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs