ITAC Assessment: IC0051
ITAC logo
ITAC Assessment: IC0051
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Stainless Steel Floats
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $1
M
to 5
M
# of Employees 23
Plant Area 29,000
ft2
Annual Production 36,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $10,554 207,480
kWh
Electricity Demand $16,517 1,351
kW-mo/yr
Electricity Fees $929 -
Natural Gas $11,962 2,152
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,795 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,877

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,535 $6,726 $625
14,582
kWh
$746
-
kW-mo/yr
$66 $98
02 2.7135: Install occupancy sensors $136 $141 $110
2,561
kWh
$26
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,877 $2,600 $859
19,867
kWh
$1,018
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $185 $150 $55
1,280
kWh
$130
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $62 - $28
656
kWh
$34
-
kW-mo/yr
- -
TOTAL RECOMMENDED $3,795 $9,617 $1,677
38,946
kWh
$1,954
-
kW-mo/yr
$66 $98
TOTAL IMPLEMENTED $1,877 $2,600 $859
19,867
kWh
$1,018
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs