Assessment Year | 2001 |
---|---|
Principal Product | Photoresist |
NAICS |
n/a
|
SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 90 |
Plant Area |
77,000
ft2
|
Annual Production | 50,000
units
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $462,854 | 6,168,000 |
kWh
|
$0.075 |
Natural Gas | $214,302 | 22,814 |
MMBtu
|
$9.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $120,400 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,037 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $11,294 | - |
$962
7,857
kWh
|
$10,332
-
MMBtu
|
- | |
02 | 2.6218: Turn off equipment when not in use | $3,916 | - |
$3,916
31,971
kWh
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $726 | $30 |
$726
5,925
kWh
|
- | - | |
04 | 2.1212: Operate boilers on high fire setting | $16,154 | $1,260 | - |
$16,154
-
MMBtu
|
- | |
05 | 2.7132: Install timers on light switches in little used areas | $35,839 | $11,800 |
$35,839
292,684
kWh
|
- | - | |
06 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $844 | $535 | - |
$844
-
MMBtu
|
- | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,016 | $3,275 |
$5,016
40,965
kWh
|
- | - | |
08 | 2.7132: Install timers on light switches in little used areas | $3,717 | $2,500 |
$3,717
30,343
kWh
|
- | - | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,944 | $14,649 | n/a |
$16,944
138,320
kWh
|
- | - |
10 | 2.7135: Install occupancy sensors | $1,758 | $2,040 |
$1,758
14,358
kWh
|
- | - | |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $863 | $1,126 |
$863
7,044
kWh
|
- | - | |
12 | 2.1233: Analyze flue gas for proper air/fuel ratio | $5,217 | $8,000 | - |
$5,217
-
MMBtu
|
- | |
13 | 2.7135: Install occupancy sensors | $8,563 | $24,267 |
$8,563
69,930
kWh
|
- | - | |
14 | 3.6194: Ship hydraulic oil to secondary fuel program | $9,549 | $15,524 | - | - |
$9,549
-
lb
|
|
TOTAL RECOMMENDED | $120,400 | $85,006 |
$78,304
639,397
kWh
|
$32,547
-
MMBtu
|
$9,549
-
lb
|
||
TOTAL IMPLEMENTED | $48,037 | $21,276 |
$47,193
385,394
kWh
|
$844
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs