Assessment Year | 1999 |
---|---|
Principal Product | Electric Motors |
NAICS |
n/a
|
SIC | 3621: Motors and Generators |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
120,000
ft2
|
Annual Production | 190,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $190,620 | 2,156,213 |
kWh
|
$0.088 |
Electricity Demand | $52,649 | 6,710 |
kW-mo/yr
|
$7.85 |
Electricity Fees | $1,481 | - |
|
- |
Natural Gas | $30,812 | 4,725 |
MMBtu
|
$6.52 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,469 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,555 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Raw Material Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,284 | $80,602 |
$13,970
155,334
kWh
|
$4,314
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $10,535 | $25,000 |
$9,110
101,407
kWh
|
$4,240
-
kW-mo/yr
|
$(-2,815.0)
-
MMBtu
|
- | - | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $9,477 | $7,909 |
$10,934
121,630
kWh
|
$3,108
-
kW-mo/yr
|
$(-4,565.0)
-
MMBtu
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,134 | $900 |
$7,134
79,426
kWh
|
- | - | - | - | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,914 | $11,200 |
$974
10,844
kWh
|
$4,240
-
kW-mo/yr
|
$(-300.0)
-
MMBtu
|
- | - | - | |
06 | 2.4322: Use or replace with energy efficient substitutes | $4,704 | $12,000 |
$3,276
36,049
kWh
|
$1,428
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $4,394 | $3,080 |
$4,394
48,652
kWh
|
- | - | - | - | - | |
08 | 2.2511: Insulate bare equipment | $1,053 | $1,200 |
$1,053
11,723
kWh
|
- | - | - | - | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $886 | $200 |
$886
9,965
kWh
|
- | - | - | - | - | |
10 | 3.4151: Minimize water usage | $788 | $500 | - | - | - |
$485
-
Tgal
|
- |
$303
-
Tgal
|
|
11 | 2.4151: Develop a repair/replace policy | $271 | $325 |
$190
1,758
kWh
|
- | - |
$51
-
Tgal
|
- |
$30
-
Tgal
|
|
12 | 4.125: | $29 | $27 | - | - | - | - | $29 | - | |
TOTAL RECOMMENDED | $62,469 | $142,943 |
$51,921
576,788
kWh
|
$17,330
-
kW-mo/yr
|
$(-7,680.0)
-
MMBtu
|
$536
-
Tgal
|
$29 |
$333
-
Tgal
|
||
TOTAL IMPLEMENTED | $57,555 | $131,743 |
$50,947
565,944
kWh
|
$13,090
-
kW-mo/yr
|
$(-7,380.0)
-
MMBtu
|
$536
-
Tgal
|
$29 |
$333
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Primary Raw Material Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs