ITAC Assessment: ME0261
ITAC logo
ITAC Assessment: ME0261
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Electric Motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 120,000
ft2
Annual Production 190,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $190,620 2,156,213
kWh
Electricity Demand $52,649 6,710
kW-mo/yr
Electricity Fees $1,481 -
Natural Gas $30,812 4,725
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,469 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,555

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Raw Material Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $18,284 $80,602 $13,970
155,334
kWh
$4,314
-
kW-mo/yr
- - - -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $10,535 $25,000 $9,110
101,407
kWh
$4,240
-
kW-mo/yr
$(-2,815.0)
-
MMBtu
- - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,477 $7,909 $10,934
121,630
kWh
$3,108
-
kW-mo/yr
$(-4,565.0)
-
MMBtu
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,134 $900 $7,134
79,426
kWh
- - - - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,914 $11,200 $974
10,844
kWh
$4,240
-
kW-mo/yr
$(-300.0)
-
MMBtu
- - -
06 2.4322: Use or replace with energy efficient substitutes $4,704 $12,000 $3,276
36,049
kWh
$1,428
-
kW-mo/yr
- - - -
07 2.2614: Use cooling tower or economizer to replace chiller cooling $4,394 $3,080 $4,394
48,652
kWh
- - - - -
08 2.2511: Insulate bare equipment $1,053 $1,200 $1,053
11,723
kWh
- - - - -
09 2.4221: Install compressor air intakes in coolest locations $886 $200 $886
9,965
kWh
- - - - -
10 3.4151: Minimize water usage $788 $500 - - - $485
-
Tgal
- $303
-
Tgal
11 2.4151: Develop a repair/replace policy $271 $325 $190
1,758
kWh
- - $51
-
Tgal
- $30
-
Tgal
12 4.125: $29 $27 - - - - $29 -
TOTAL RECOMMENDED $62,469 $142,943 $51,921
576,788
kWh
$17,330
-
kW-mo/yr
$(-7,680.0)
-
MMBtu
$536
-
Tgal
$29 $333
-
Tgal
TOTAL IMPLEMENTED $57,555 $131,743 $50,947
565,944
kWh
$13,090
-
kW-mo/yr
$(-7,380.0)
-
MMBtu
$536
-
Tgal
$29 $333
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs