Assessment Year | 1995 |
---|---|
Principal Product | auto starters and alternators |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 260 |
Plant Area |
300,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 6,300
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $587,000 | 10,662,075 |
kWh
|
$0.055 |
Natural Gas | $89,820 | 16,917 |
MMBtu
|
$5.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $90,302 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $87,582 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $38,300 | $70,000 | - | - | - | $38,300 | |
02 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $12,684 | - |
$12,684
129,836
kWh
|
- | - | - | |
03 | 2.2437: Recover waste heat from equipment | $10,700 | $24,000 | - |
$10,700
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,644 | $12,083 |
$5,117
74,150
kWh
|
$(-473.0)
-
MMBtu
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $18,574 | $58,500 |
$19,774
442,556
kWh
|
$(-2,820.0)
-
MMBtu
|
$1,620 | - | |
06 | 2.7124: Make a practice of turning off lights when not needed | $2,680 | - |
$5,030
194,607
kWh
|
$(-1,328.0)
-
MMBtu
|
$(-1,022.0) | - | |
07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,720 | - |
$2,720
-
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $90,302 | $164,583 |
$45,325
841,149
kWh
|
$6,079
-
MMBtu
|
$598 | $38,300 | ||
TOTAL IMPLEMENTED | $87,582 | $164,583 |
$42,605
841,149
kWh
|
$6,079
-
MMBtu
|
$598 | $38,300 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs