ITAC Assessment: UD0456
ITAC logo
ITAC Assessment: UD0456
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product auto starters and alternators
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 300,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 6,300
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $587,000 10,662,075
kWh
Natural Gas $89,820 16,917
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,302 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $87,582

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $38,300 $70,000 - - - $38,300
02 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $12,684 - $12,684
129,836
kWh
- - -
03 2.2437: Recover waste heat from equipment $10,700 $24,000 - $10,700
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,644 $12,083 $5,117
74,150
kWh
$(-473.0)
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $18,574 $58,500 $19,774
442,556
kWh
$(-2,820.0)
-
MMBtu
$1,620 -
06 2.7124: Make a practice of turning off lights when not needed $2,680 - $5,030
194,607
kWh
$(-1,328.0)
-
MMBtu
$(-1,022.0) -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,720 - $2,720
-
kWh
- - -
TOTAL RECOMMENDED $90,302 $164,583 $45,325
841,149
kWh
$6,079
-
MMBtu
$598 $38,300
TOTAL IMPLEMENTED $87,582 $164,583 $42,605
841,149
kWh
$6,079
-
MMBtu
$598 $38,300
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs