Assessment Year | 1999 |
---|---|
Principal Product | ovens |
NAICS |
n/a
|
SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 210 |
Plant Area |
88,000
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Vermont |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $59,727 | 878,664 |
kWh
|
$0.068 |
Electricity Demand | $31,248 | 2,812 |
kW-mo/yr
|
$11.11 |
Electricity Fees | $4,150 | - |
|
- |
Fuel Oil #2 | $43,591 | 7,582 |
MMBtu
|
$5.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $95,170 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $94,499 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,536 | $21,031 |
$5,799
67,702
kWh
|
$4,737
-
kW-mo/yr
|
- | - | - | |
02 | 2.2437: Recover waste heat from equipment | $7,900 | $1,000 |
$7,900
112,837
kWh
|
- | - | - | - | |
03 | 4.731: Advertise product or service | $2,993 | - | - | - | - |
$2,993
-
MMBtu
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,980 | $6,797 | - | - | - |
$2,980
-
MMBtu
|
- | |
05 | 2.2511: Insulate bare equipment | $2,268 | $879 | - | - | - |
$2,268
-
MMBtu
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $920 | $20 | - | - |
$920
-
MMBtu
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $702 | $300 | - | - |
$702
-
MMBtu
|
- | - | |
08 | 2.7241: Install outside air damper / economizer on hvac unit | $671 | $1,960 | - | - |
$671
-
MMBtu
|
- | - | |
09 | 3.1192: Reduce scrap production | $66,200 | $20,000 | - | - | - | - | $66,200 | |
TOTAL RECOMMENDED | $95,170 | $51,987 |
$13,699
180,539
kWh
|
$4,737
-
kW-mo/yr
|
$2,293
-
MMBtu
|
$8,241
-
MMBtu
|
$66,200 | ||
TOTAL IMPLEMENTED | $94,499 | $50,027 |
$13,699
180,539
kWh
|
$4,737
-
kW-mo/yr
|
$1,622
-
MMBtu
|
$8,241
-
MMBtu
|
$66,200 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs