ITAC Assessment: ME0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Footwear
NAICS
n/a
SIC 3143: Men's Footwear, Except Athletic
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 161,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $337,439 4,814,771
kWh
Electricity Demand $160,899 30,115
kW-mo/yr
Electricity Fees $27,475 -
LPG $144 7
MMBtu
Fuel Oil #2 $46,538 7,979
MMBtu
Fuel Oil #4 $59,077 12,891
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 4.112: Replace old machine with new automatic multi-station tool $45,000 $150,000 - - - - $45,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $20,132 $46,836 $14,047
200,469
kWh
$6,085
-
kW-mo/yr
- - -
03 2.3511: Use plant owned transformers or lease transformers $6,992 $31,060 - - - - $6,992
04 4.231: Purchase equipment instead of leasing $4,542 $11,495 - - - - $4,542
05 2.4221: Install compressor air intakes in coolest locations $2,336 $300 $2,336
33,411
kWh
- - - -
06 2.7291: Reschedule and rearrange multiple-source heating systems $1,083 $4,178 - - $1,083
-
MMBtu
- -
07 2.2511: Insulate bare equipment $868 $858 $868
12,309
kWh
- - - -
08 2.6212: Turn off equipment during breaks, reduce operating time $562 - $562
7,913
kWh
- - - -
09 2.2437: Recover waste heat from equipment $804 $1,500 $804
40,445
kWh
- - - -
10 2.2511: Insulate bare equipment $406 $122 - - $406
-
MMBtu
- -
11 3.5212: Regrind, reuse, or sell scrap plastic parts $74 - - - - $74
-
lb
-
TOTAL RECOMMENDED $82,799 $246,349 $18,617
294,547
kWh
$6,085
-
kW-mo/yr
$1,489
-
MMBtu
$74
-
lb
$56,534
TOTAL IMPLEMENTED $24,304 $48,116 $17,813
254,102
kWh
$6,085
-
kW-mo/yr
$406
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs