ITAC Assessment: ME0223
ITAC logo
ITAC Assessment: ME0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Wood Turnings
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 52
Plant Area 78,000
ft2
Annual Production 3,000,000
thousand feet
Production Hrs. Annual 2,210
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,731 1,176,436
kWh
Electricity Demand $53,231 5,344
kW-mo/yr
Electricity Fees $4,590 -
LPG $2,403 133
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,294

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,319 $8,303 $1,311
18,757
kWh
$1,008
-
kW-mo/yr
- - - -
02 4.231: Purchase equipment instead of leasing $1,356 $2,300 $(-306.0)
(-4,396)
kWh
$(-119.0)
-
kW-mo/yr
$1,841 $(-60.0) - -
03 2.4221: Install compressor air intakes in coolest locations $1,066 $650 $1,066
15,240
kWh
- - - - -
04 2.2135: Repair and eliminate steam leaks $941 $500 - - - - - $941
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $829 $2,085 $829
11,723
kWh
- - - - -
06 4.821: Pay bills on time to avoid late fees $655 - - - $655 - - -
07 2.4133: Use most efficient type of electric motors $360 $190 $308
4,396
kWh
$52
-
kW-mo/yr
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $215 $500 $215
3,224
kWh
- - - - -
09 3.2123: Convert to high volume low pressure (hvlp) paint guns $6,387 $1,677 - - - - $6,387 -
10 3.5313: Increase amount of waste recovered for resale $1,008 - - - - - $1,008 -
11 3.4154: Eliminate leaks in water lines and valves $76 $25 - - - - - $76
TOTAL RECOMMENDED $15,212 $16,230 $3,423
48,944
kWh
$941
-
kW-mo/yr
$2,496 $(-60.0) $7,395 $1,017
TOTAL IMPLEMENTED $11,294 $13,305 $1,220
17,585
kWh
$889
-
kW-mo/yr
$1,841 $(-60.0) $6,387 $1,017
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs