ITAC Assessment: BD0001
ITAC logo
ITAC Assessment: BD0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Farm Equiupment & Pick-up Towing Systems
NAICS
n/a
SIC 3523: Farm Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 230,000
ft2
Annual Production 13,200
pieces
Production Hrs. Annual 4,416
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $248,634 3,630,422
kWh
Natural Gas $99,258 36,093
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,031 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,495

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $3,894 $8,270 $3,894
56,858
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,344 $5,760 $2,344
34,291
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,156 $8,063 $2,156
31,360
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $357 $350 $357
5,275
kWh
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,129 $3,735 - $2,129
-
MMBtu
-
06 2.8121: Apply for tax-free status for energy purchases $13,151 $250 - - $13,151
TOTAL RECOMMENDED $24,031 $26,428 $8,751
127,784
kWh
$2,129
-
MMBtu
$13,151
TOTAL IMPLEMENTED $15,495 $6,010 $2,344
34,291
kWh
- $13,151
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs