Assessment Year | 1997 |
---|---|
Principal Product | Glued Wood Dimensions |
NAICS |
n/a
|
SIC | 2426: Hardwood Dimension and Flooring Mills |
Sales Range | $5 M to 10M |
# of Employees | 110 |
Plant Area |
50,000
ft2
|
Annual Production | 9,000,000
thousand feet
|
Production Hrs. Annual | 4,100
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $175,918 | 2,940,797 |
kWh
|
$0.060 |
Electricity Demand | $70,387 | 10,726 |
kW-mo/yr
|
$6.56 |
Electricity Fees | $6,453 | - |
|
- |
LPG | $2,678 | 179 |
MMBtu
|
$14.96 |
Fuel Oil #1 | $1,509 | 175 |
MMBtu
|
$8.62 |
Fuel Oil #2 | $34,620 | 4,162 |
MMBtu
|
$8.32 |
Other Energy | $5,811 | 585 |
MMBtu
|
$9.93 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,747 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,547 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Wood Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 4.231: Purchase equipment instead of leasing | $7,200 | $27,375 | - | - | - | - | - | $7,200 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,389 | $8,204 |
$4,995
53,634
kWh
|
$394
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $3,895 | $13,215 |
$3,214
53,341
kWh
|
$681
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,941 | $3,276 |
$2,941
48,945
kWh
|
- | - | - | - | - | |
05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,517 | $3,844 |
$1,492
24,912
kWh
|
$683
-
kW-mo/yr
|
$(-658.0)
-
MMBtu
|
- | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $597 | $603 | - | - | - |
$597
-
MMBtu
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $564 | $325 |
$564
9,379
kWh
|
- | - | - | - | - | |
08 | 2.8121: Apply for tax-free status for energy purchases | $144 | - | - | - | - | - | - | $144 | |
09 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $500 | - | - | - | - | - |
$500
-
lb
|
- | |
TOTAL RECOMMENDED | $22,747 | $56,842 |
$13,206
190,211
kWh
|
$1,758
-
kW-mo/yr
|
$(-658.0)
-
MMBtu
|
$597
-
MMBtu
|
$500
-
lb
|
$7,344 | ||
TOTAL IMPLEMENTED | $15,547 | $29,467 |
$13,206
190,211
kWh
|
$1,758
-
kW-mo/yr
|
$(-658.0)
-
MMBtu
|
$597
-
MMBtu
|
$500
-
lb
|
$144 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Wood Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs