ITAC Assessment: ME0217
ITAC logo
ITAC Assessment: ME0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Glued Wood Dimensions
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 50,000
ft2
Annual Production 9,000,000
thousand feet
Production Hrs. Annual 4,100
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,918 2,940,797
kWh
Electricity Demand $70,387 10,726
kW-mo/yr
Electricity Fees $6,453 -
LPG $2,678 179
MMBtu
Fuel Oil #1 $1,509 175
MMBtu
Fuel Oil #2 $34,620 4,162
MMBtu
Other Energy $5,811 585
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,747 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,547

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Wood Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 4.231: Purchase equipment instead of leasing $7,200 $27,375 - - - - - $7,200
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,389 $8,204 $4,995
53,634
kWh
$394
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $3,895 $13,215 $3,214
53,341
kWh
$681
-
kW-mo/yr
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,941 $3,276 $2,941
48,945
kWh
- - - - -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,517 $3,844 $1,492
24,912
kWh
$683
-
kW-mo/yr
$(-658.0)
-
MMBtu
- - -
06 2.2136: Install / repair insulation on steam lines $597 $603 - - - $597
-
MMBtu
- -
07 2.4221: Install compressor air intakes in coolest locations $564 $325 $564
9,379
kWh
- - - - -
08 2.8121: Apply for tax-free status for energy purchases $144 - - - - - - $144
09 3.5248: Separate and recycle scrap metal to foundry or for sale $500 - - - - - $500
-
lb
-
TOTAL RECOMMENDED $22,747 $56,842 $13,206
190,211
kWh
$1,758
-
kW-mo/yr
$(-658.0)
-
MMBtu
$597
-
MMBtu
$500
-
lb
$7,344
TOTAL IMPLEMENTED $15,547 $29,467 $13,206
190,211
kWh
$1,758
-
kW-mo/yr
$(-658.0)
-
MMBtu
$597
-
MMBtu
$500
-
lb
$144
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Wood Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs