ITAC Assessment: OK1113
ITAC logo
ITAC Assessment: OK1113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product RF & EM Absorbers
NAICS 334419: Other Electronic Component Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 100,000
ft2
Annual Production 7,800
units
Production Hrs. Annual 4,940
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $256,123 3,353,600
kWh
Electricity Demand $48,281 6,680
kW-mo/yr
Natural Gas $190,566 31,761
MMBtu
Waste Disposal Costs
Water Usage $4,636 1,159
Tgal
Water Disposal $5,795 1,159
Tgal
TOTAL YEARLY COSTS $505,401
RECOMMENDED SAVINGS* $31,908 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7211: Clean and maintain refrigerant condensers and towers $3,139 $4,760 $3,139
41,295
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,798 $1,675 $1,798
23,653
kWh
- -
03 2.9114: Use solar heat to make electricty $25,346 $210,600 $25,346
333,493
kWh
- -
04 2.8117: Install sub-metering equipment $1,500 $1,100 - - $1,500
05 2.7142: Utilize higher efficiency lamps and/or ballasts $125 $611 $87
1,149
kWh
$38
-
kW-mo/yr
-
TOTAL RECOMMENDED $31,908 $218,746 $30,370
399,590
kWh
$38
-
kW-mo/yr
$1,500
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs