ITAC Assessment: SD0210
ITAC logo
ITAC Assessment: SD0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Couplers
NAICS
n/a
SIC 3644: Noncurrent-Carrying Wiring Devices
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 38,100
ft2
Annual Production 14,000,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,967 689,039
kWh
Electricity Demand $29,502 3,199
kW-mo/yr
Natural Gas $31,247 5,779
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,261 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $901 - $541
7,034
kWh
$360
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,500 $36,250 $4,780
62,134
kWh
$2,720
-
kW-mo/yr
-
03 4.111: Add equipment/ operators to reduce production bottleneck $8,860 $3,100 - - $8,860
TOTAL RECOMMENDED $17,261 $39,350 $5,321
69,168
kWh
$3,080
-
kW-mo/yr
$8,860
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs