ITAC Assessment: ME0196
ITAC logo
ITAC Assessment: ME0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Potato Chips
NAICS
n/a
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range $10
M
to 50
M
# of Employees 112
Plant Area 50,000
ft2
Annual Production 6,500,000
lb
Production Hrs. Annual 1,800
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,530 548,945
kWh
Electricity Demand $18,550 2,215
kW-mo/yr
Electricity Fees $1,520 -
LPG $15,786 2,128
MMBtu
Fuel Oil #2 $52,328 11,305
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,007

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 2.8121: Apply for tax-free status for energy purchases $2,928 - - - - - $2,928 -
02 2.6231: Utilize controls to operate equipment only when needed $2,757 - - - $2,757
-
MMBtu
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,035 $9,015 $2,551
29,601
kWh
$484
-
kW-mo/yr
- - - -
04 2.8123: Pay utility bills on time $628 - - - - - $628 -
05 2.6231: Utilize controls to operate equipment only when needed $626 $1,075 $626
9,086
kWh
- - - - -
06 2.8114: Change rate schedules or other changes in utility service $397 $1,000 - - - - $397 -
07 2.2511: Insulate bare equipment $236 $126 - - $236
-
MMBtu
- - -
08 2.4221: Install compressor air intakes in coolest locations $229 $300 $229
3,517
kWh
- - - - -
09 3.4151: Minimize water usage $928 $250 - - - $748
-
Tgal
- $180
-
Tgal
TOTAL RECOMMENDED $11,764 $11,766 $3,406
42,204
kWh
$484
-
kW-mo/yr
$2,993
-
MMBtu
$748
-
Tgal
$3,953 $180
-
Tgal
TOTAL IMPLEMENTED $9,007 $11,766 $3,406
42,204
kWh
$484
-
kW-mo/yr
$236
-
MMBtu
$748
-
Tgal
$3,953 $180
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs