Assessment Year | 1995 |
---|---|
Principal Product | Electrical Components |
NAICS |
n/a
|
SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
Sales Range | $50 M to 100M |
# of Employees | 180 |
Plant Area |
185,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $393,904 | 4,395,076 |
kWh
|
$0.090 |
Fuel Oil #2 | $47,641 | 11,006 |
MMBtu
|
$4.33 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $68,133 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,252 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $20,883 | $50,267 |
$20,883
231,536
kWh
|
- | - | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $18,527 | $1,500 |
$18,527
205,158
kWh
|
- | - | - | - | - | - | |
03 | 3.4116: Meter recycled water (to reduce sewer charges) | $5,200 | $400 | - | - | - |
$5,200
-
Tgal
|
- | - | - | |
04 | 4.231: Purchase equipment instead of leasing | $11,057 | $30,000 | - | - | - | - | - | $11,057 | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,796 | $980 |
$2,796
30,774
kWh
|
- | - | - | - | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,537 | $1,175 |
$2,757
58,617
kWh
|
$(-220.0)
-
MMBtu
|
- | - | - | - | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $2,118 | $800 |
$2,118
25,791
kWh
|
- | - | - | - | - | - | |
08 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,900 | $400 | - | - |
$1,900
-
MMBtu
|
- | - | - | - | |
09 | 3.4151: Minimize water usage | $2,815 | $440 |
$1,820
20,223
kWh
|
- | - |
$614
-
Tgal
|
- | - |
$381
-
Tgal
|
|
10 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $300 | $150 | - | - | - | - |
$300
-
lb
|
- | - | |
TOTAL RECOMMENDED | $68,133 | $86,112 |
$48,901
572,099
kWh
|
$(-220.0)
-
MMBtu
|
$1,900
-
MMBtu
|
$5,814
-
Tgal
|
$300
-
lb
|
$11,057 |
$381
-
Tgal
|
||
TOTAL IMPLEMENTED | $7,252 | $2,015 |
$4,577
78,840
kWh
|
$(-220.0)
-
MMBtu
|
$1,900
-
MMBtu
|
$614
-
Tgal
|
- | - |
$381
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #2 Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs