ITAC Assessment: AT0017
ITAC logo
ITAC Assessment: AT0017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product THERMOPLASTIC ITEMS
NAICS
n/a
SIC 3083: Laminated Plastics Plate, Sheet, and Profile Shapes
Sales Range $1
M
to 5
M
# of Employees 35
Plant Area
n/a
Annual Production 1,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,669 1,262,016
kWh
Fuel Oil #2 $14,986 2,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,281 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,260

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.4133: Use most efficient type of electric motors $483 $381 $483
9,379
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $146 - $146
2,931
kWh
-
03 2.7261: Install timers and/or thermostats $6,114 - - $6,114
-
MMBtu
04 2.2511: Insulate bare equipment $2,313 $200 $2,313
45,135
kWh
-
05 2.2692: Use outside cold water source as a supply of cooling water $10,225 $1,250 $10,225
199,590
kWh
-
TOTAL RECOMMENDED $19,281 $1,831 $13,167
257,035
kWh
$6,114
-
MMBtu
TOTAL IMPLEMENTED $6,260 - $146
2,931
kWh
$6,114
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs