Assessment Year | 2018 |
---|---|
Principal Product | Medical Imaging Equipment |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
54,000
ft2
|
Annual Production | 400
units
|
Production Hrs. Annual | 5,148
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $464,192 | 3,421,500 |
kWh
|
$0.14 | |
Electricity Demand | $37,745 | 7,338 |
kW-mo/yr
|
$5.14 | |
Electricity Fees | $2,584 | - |
|
- | |
Natural Gas | $21,591 | 2,482 |
MMBtu
|
$8.70 | |
Waste Disposal Costs | |||||
Water Usage | $20,641 | 2,101,132 |
Tgal
|
$0.010 | |
TOTAL YEARLY COSTS | $546,753 | ||||
RECOMMENDED SAVINGS* | $46,788 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $22,415 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $22,415 | $29,288 |
$18,217
133,951
kWh
|
$4,198
-
kW-mo/yr
|
- | |
02 | 2.2623: Minimize condenser cooling water temperature | $9,053 | $960 |
$9,053
66,563
kWh
|
- | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $10,660 | $1,200 |
$10,660
78,384
kWh
|
- | - | |
04 | 2.7271: Replace electric reheat with heat pipes | $2,881 | $6,120 |
$3,945
29,007
kWh
|
- |
$(-1,064.0)
-
MMBtu
|
|
05 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $1,779 | $960 |
$1,196
8,792
kWh
|
- |
$583
-
MMBtu
|
|
TOTAL RECOMMENDED | $46,788 | $38,528 |
$43,071
316,697
kWh
|
$4,198
-
kW-mo/yr
|
$(-481.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $22,415 | $29,288 |
$18,217
133,951
kWh
|
$4,198
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs