ITAC Assessment: MA0789
ITAC logo
ITAC Assessment: MA0789
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Medical Imaging Equipment
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 54,000
ft2
Annual Production 400
units
Production Hrs. Annual 5,148
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $464,192 3,421,500
kWh
Electricity Demand $37,745 7,338
kW-mo/yr
Electricity Fees $2,584 -
Natural Gas $21,591 2,482
MMBtu
Waste Disposal Costs
Water Usage $20,641 2,101,132
Tgal
TOTAL YEARLY COSTS $546,753
RECOMMENDED SAVINGS* $46,788 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,415

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $22,415 $29,288 $18,217
133,951
kWh
$4,198
-
kW-mo/yr
-
02 2.2623: Minimize condenser cooling water temperature $9,053 $960 $9,053
66,563
kWh
- -
03 2.6231: Utilize controls to operate equipment only when needed $10,660 $1,200 $10,660
78,384
kWh
- -
04 2.7271: Replace electric reheat with heat pipes $2,881 $6,120 $3,945
29,007
kWh
- $(-1,064.0)
-
MMBtu
05 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $1,779 $960 $1,196
8,792
kWh
- $583
-
MMBtu
TOTAL RECOMMENDED $46,788 $38,528 $43,071
316,697
kWh
$4,198
-
kW-mo/yr
$(-481.0)
-
MMBtu
TOTAL IMPLEMENTED $22,415 $29,288 $18,217
133,951
kWh
$4,198
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs