| Assessment Year | 2010 |
|---|---|
| Principal Product | Mattresses |
| NAICS | 337910: Mattress Manufacturing |
| SIC | 2515: Mattresses, Foundations, and Convertible Beds |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
130,000
ft2
|
| Annual Production | 6,600,000
lb
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Massachusetts |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $120,278 | 899,400 |
kWh
|
$0.13 |
| Electricity Demand | $17,599 | 4,282 |
kW-mo/yr
|
$4.11 |
| Electricity Fees | $3,576 | - |
|
- |
| Natural Gas | $140,275 | 10,316 |
MMBtu
|
$13.60 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,515 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,257 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $10,606 | $38,400 | - | - |
$10,606
-
MMBtu
|
|
| 02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,052 | $12,150 | - | - |
$4,052
-
MMBtu
|
|
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $2,527 | $4,840 |
$(-750.0)
(-5,606)
kWh
|
$(-27.0)
-
kW-mo/yr
|
$3,304
-
MMBtu
|
|
| 04 | 2.7261: Install timers and/or thermostats | $1,169 | - | - | - |
$1,169
-
MMBtu
|
|
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,401 | $480 |
$1,401
10,479
kWh
|
- | - | |
| 06 | 2.7135: Install occupancy sensors | $2,125 | $7,500 |
$2,125
15,897
kWh
|
- | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $1,635 | $2,400 |
$1,635
12,227
kWh
|
- | - | |
| TOTAL RECOMMENDED | $23,515 | $65,770 |
$4,411
32,997
kWh
|
$(-27.0)
-
kW-mo/yr
|
$19,131
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $8,257 | $15,030 |
$3,036
22,706
kWh
|
- |
$5,221
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs