ITAC Assessment: GT0439
ITAC logo
ITAC Assessment: GT0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product DIMENSION STONE
NAICS
n/a
SIC 3281: Cut Stone and Stone Products
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area
n/a
Annual Production 41,400
ton
Production Hrs. Annual 2,040
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $531,322 6,179,953
kWh
Natural Gas $43,524 7,439
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $66,921 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,921

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $500 - - $800
-
MMBtu
$(-300.0)
02 2.2121: Increase amount of condensate returned $960 - - $960
-
MMBtu
-
03 2.2122: Install / repair insulation on condensate lines $158 $289 - $158
-
MMBtu
-
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $37,560 - $37,560
-
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $183 - $238
2,931
kWh
- $(-55.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,110 $3,441 $3,110
38,980
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,900 $4,800 $17,900
223,916
kWh
- -
08 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $6,550 $500 $6,550
81,770
kWh
- -
TOTAL RECOMMENDED $66,921 $9,030 $65,358
347,597
kWh
$1,918
-
MMBtu
$(-355.0)
TOTAL IMPLEMENTED $66,921 $9,030 $65,358
347,597
kWh
$1,918
-
MMBtu
$(-355.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs