ITAC Assessment: LT8372
ITAC logo
ITAC Assessment: LT8372
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Ship Building and Repairing
NAICS 336611: Ship Building and Repairing
SIC 3731: Ship Building and Repairing
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area 390,000
ft2
Annual Production 50
units
Production Hrs. Annual 2,808
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $87,107 628,785
kWh
Electricity Fees $9,582 -
TOTAL YEARLY COSTS $96,689
RECOMMENDED SAVINGS* $22,839 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $12,621 $3,316 $12,621
91,125
kWh
02 2.6212: Turn off equipment during breaks, reduce operating time $6,572 $255 $6,572
47,450
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,768 $200 $2,768
19,982
kWh
04 2.7491: Insulate glazing, walls, ceilings, and roofs $878 $2,730 $878
6,338
kWh
TOTAL RECOMMENDED $22,839 $6,501 $22,839
164,895
kWh
TOTAL IMPLEMENTED - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs