ITAC Assessment: AM0116
ITAC logo
ITAC Assessment: AM0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product STEEL FORGING
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $5
M
to 10
M
# of Employees 40
Plant Area
n/a
Annual Production 12,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,379 1,112,837
kWh
Natural Gas $258,797 107,778
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $119,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2422: Use waste heat from hot flue gases to generate steam $114,570 $157,300 $(-13,090.0)
(-184,642)
kWh
$127,660
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $817 $1,117 $817
14,068
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $2,180 $660 $2,180
29,308
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,055 - $1,210
17,585
kWh
- $(-155.0)
05 2.4231: Reduce the pressure of compressed air to the minimum required $450 $1,005 $450
7,620
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $28 $12 $28
293
kWh
- -
TOTAL RECOMMENDED $119,100 $160,094 $(-8,405.0)
(-115,768)
kWh
$127,660
-
MMBtu
$(-155.0)
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs