ITAC Assessment: KU0552
ITAC logo
ITAC Assessment: KU0552
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product magnetic conveyors and equipment
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 198
Plant Area 43,200
ft2
Annual Production 1,000
ton
Production Hrs. Annual 6,000
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,662 1,287,040
kWh
Electricity Demand $41,843 3,643
kW-mo/yr
Electricity Fees $1,253 -
Natural Gas $7,660 1,207
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,292 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $900 $600 $552
15,240
kWh
$348
-
kW-mo/yr
- - -
02 2.3212: Optimize plant power factor $699 $725 - - $699 - -
03 2.4221: Install compressor air intakes in coolest locations $378 $206 $232
6,448
kWh
$146
-
kW-mo/yr
- - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $3,315 $6,000 - - - $3,315
-
lb
-
05 3.5311: Recover and reuse waste material $12,000 $11,400 - - - $(-6,000.0)
-
lb
$18,000
TOTAL RECOMMENDED $17,292 $18,931 $784
21,688
kWh
$494
-
kW-mo/yr
$699 $(-2,685.0)
-
lb
$18,000
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs