Assessment Year | 2006 |
---|---|
Principal Product | Epoxies, urethanes and colored quartz aggregates for floors |
NAICS | 325211: Plastics Material and Resin Manufacturing |
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
144,500
ft2
|
Annual Production | 14,000,000
lb
|
Production Hrs. Annual | 2,860
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $74,399 | 1,052,544 |
kWh
|
$0.071 |
Electricity Demand | $29,486 | 3,474 |
kW-mo/yr
|
$8.49 |
Electricity Fees | $3,507 | - |
|
- |
Natural Gas | $86,089 | 7,379 |
MMBtu
|
$11.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $116,498 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $110,810 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.621: Use fixtures to reduce machine changeout times | $50,414 | $4,000 |
$2,854
40,200
kWh
|
- |
$2,560
-
MMBtu
|
$45,000 | |
02 | 2.7221: Lower temperature during the winter season and vice-versa | $16,617 | $75,860 | - | - |
$16,617
-
MMBtu
|
- | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $10,740 | $5,440 |
$(-1,020.0)
(-14,355)
kWh
|
$(-127.0)
-
kW-mo/yr
|
$11,887
-
MMBtu
|
- | |
04 | 2.8122: Use utility controlled power management | $9,148 | $4,500 |
$1,655
2,900
kWh
|
$8,000
-
kW-mo/yr
|
$(-507.0)
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,400 | $37,895 |
$5,930
83,540
kWh
|
$2,470
-
kW-mo/yr
|
- | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,195 | $13,000 |
$(-225.0)
(-3,140)
kWh
|
$(-34.0)
-
kW-mo/yr
|
$5,454
-
MMBtu
|
- | |
07 | 2.7135: Install occupancy sensors | $4,855 | $8,000 |
$4,855
68,410
kWh
|
- | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,870 | $18,200 |
$5,360
75,500
kWh
|
$2,682
-
kW-mo/yr
|
$(-3,172.0)
-
MMBtu
|
- | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,026 | $5,350 |
$2,017
28,400
kWh
|
$1,009
-
kW-mo/yr
|
- | - | |
10 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $2,415 | $9,840 | - | - |
$2,415
-
MMBtu
|
- | |
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $458 | - |
$305
4,300
kWh
|
$153
-
kW-mo/yr
|
- | - | |
12 | 2.4221: Install compressor air intakes in coolest locations | $360 | $900 |
$241
3,400
kWh
|
$119
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $116,498 | $182,985 |
$21,972
289,155
kWh
|
$14,272
-
kW-mo/yr
|
$35,254
-
MMBtu
|
$45,000 | ||
TOTAL IMPLEMENTED | $110,810 | $163,885 |
$16,066
205,955
kWh
|
$11,318
-
kW-mo/yr
|
$38,426
-
MMBtu
|
$45,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs