Assessment Year | 1999 |
---|---|
Principal Product | Forged and Cast Metal Products |
NAICS |
n/a
|
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 240 |
Plant Area |
90,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $319,455 | 4,412,954 |
kWh
|
$0.072 |
Electricity Demand | $52,708 | 14,520 |
kW-mo/yr
|
$3.63 |
Natural Gas | $132,945 | 31,351 |
MMBtu
|
$4.24 |
Fuel Oil #2 | $25,390 | 5,273 |
MMBtu
|
$4.82 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $285,244 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,399 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.111: Add equipment/ operators to reduce production bottleneck | $186,395 | $900,000 |
$(-15,590.0)
(-227,433)
kWh
|
$(-4,761.0)
-
kW-mo/yr
|
$11,746
-
MMBtu
|
$195,000 | |
02 | 4.111: Add equipment/ operators to reduce production bottleneck | $73,450 | $125,600 | - | - | - | $73,450 | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $19,396 | $38,500 |
$21,557
314,478
kWh
|
$3,292
-
kW-mo/yr
|
$(-5,453.0)
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,380 | $11,544 |
$3,737
54,513
kWh
|
$643
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $964 | $2,575 |
$964
14,068
kWh
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $402 | $955 |
$402
5,862
kWh
|
- | - | - | |
07 | 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation | $257 | $640 |
$151
2,052
kWh
|
- |
$106
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $285,244 | $1,079,814 |
$11,221
163,540
kWh
|
$(-826.0)
-
kW-mo/yr
|
$6,399
-
MMBtu
|
$268,450 | ||
TOTAL IMPLEMENTED | $25,399 | $54,214 |
$26,811
390,973
kWh
|
$3,935
-
kW-mo/yr
|
$(-5,347.0)
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs