ITAC Assessment: MA0442
ITAC logo
ITAC Assessment: MA0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Forged and Cast Metal Products
NAICS
n/a
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 90,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,455 4,412,954
kWh
Electricity Demand $52,708 14,520
kW-mo/yr
Natural Gas $132,945 31,351
MMBtu
Fuel Oil #2 $25,390 5,273
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $285,244 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,399

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $186,395 $900,000 $(-15,590.0)
(-227,433)
kWh
$(-4,761.0)
-
kW-mo/yr
$11,746
-
MMBtu
$195,000
02 4.111: Add equipment/ operators to reduce production bottleneck $73,450 $125,600 - - - $73,450
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $19,396 $38,500 $21,557
314,478
kWh
$3,292
-
kW-mo/yr
$(-5,453.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,380 $11,544 $3,737
54,513
kWh
$643
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $964 $2,575 $964
14,068
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $402 $955 $402
5,862
kWh
- - -
07 2.7264: Interlock heating and air conditioning systems to prevent simultaneous operation $257 $640 $151
2,052
kWh
- $106
-
MMBtu
-
TOTAL RECOMMENDED $285,244 $1,079,814 $11,221
163,540
kWh
$(-826.0)
-
kW-mo/yr
$6,399
-
MMBtu
$268,450
TOTAL IMPLEMENTED $25,399 $54,214 $26,811
390,973
kWh
$3,935
-
kW-mo/yr
$(-5,347.0)
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs