ITAC Assessment: MA0432
ITAC logo
ITAC Assessment: MA0432
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product tape and CD jewel cases
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 52
Plant Area 62,775
ft2
Annual Production 195,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,082 3,425,850
kWh
Electricity Demand $97,191 6,397
kW-mo/yr
Natural Gas $18,275 2,102
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,507 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,762

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2612: Use cooling tower water instead of refrigeration $9,010 $21,612 $5,018
121,336
kWh
$3,992
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,201 $18,690 $6,201
138,628
kWh
- -
03 2.7231: Use radiant heater for spot heating $6,592 $40,000 $1,113
26,964
kWh
$97
-
kW-mo/yr
$5,382
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $5,735 $13,320 $3,872
94,373
kWh
$1,863
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,836 - $2,836
68,581
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $703 $1,451 $703
16,999
kWh
- -
07 2.6231: Utilize controls to operate equipment only when needed $681 - $681
16,413
kWh
- -
08 2.7124: Make a practice of turning off lights when not needed $428 $200 $290
7,034
kWh
$138
-
kW-mo/yr
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $321 $30 $321
7,913
kWh
- -
TOTAL RECOMMENDED $32,507 $95,303 $21,035
498,241
kWh
$6,090
-
kW-mo/yr
$5,382
-
MMBtu
TOTAL IMPLEMENTED $17,762 $60,371 $12,145
282,532
kWh
$235
-
kW-mo/yr
$5,382
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs