ITAC Assessment: UD1090
ITAC logo
ITAC Assessment: UD1090
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Entertainment
NAICS 711110: Theater Companies and Dinner Theaters
SIC 7832: Motion Picture Theaters, Except Drive-In
Sales Range less than $500
k
# of Employees 6
Plant Area 5,000
ft2
Annual Production 1
units
Production Hrs. Annual 3,224
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,550 68,960
kWh
Natural Gas $2,800 308
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $9,351
RECOMMENDED SAVINGS* $8,488 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $6,550 $98,000 $6,550
69,000
kWh
-
02 2.6211: Conserve energy by efficient use of vending machines $700 - $700
6,900
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $482 $390 $482
5,070
kWh
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $756 $1,000 - $756
-
MMBtu
TOTAL RECOMMENDED $8,488 $99,390 $7,732
80,970
kWh
$756
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs