ITAC Assessment: MA0417
ITAC logo
ITAC Assessment: MA0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Finished Broadwoven Cotton Fabric
NAICS
n/a
SIC 2261: Finishers of Broadwoven Fabrics of Cotton
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 180,000
ft2
Annual Production 3,750
thousand feet
Production Hrs. Annual 2,860
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,403 2,203,986
kWh
Electricity Demand $88,948 11,331
kW-mo/yr
Natural Gas $199,780 59,758
MMBtu
Fuel Oil #6 $57,406 22,946
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $246

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #6 Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $16,605 $14,585 $(-107.0)
(-2,052)
kWh
$(-71.0)
-
kW-mo/yr
$16,783
-
MMBtu
02 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $37,587 $40,000 $23,080
440,504
kWh
$14,507
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $2,062 $6,430 $2,062
38,687
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $246 $195 $246
4,689
kWh
- -
TOTAL RECOMMENDED $56,500 $61,210 $25,281
481,828
kWh
$14,436
-
kW-mo/yr
$16,783
-
MMBtu
TOTAL IMPLEMENTED $246 $195 $246
4,689
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs