Assessment Year | 1998 |
---|---|
Principal Product | Press fabrics |
NAICS |
n/a
|
SIC | 2299: Textile goods, Not Elsewhere Classified |
Sales Range | n/a |
# of Employees | 200 |
Plant Area |
208,000
ft2
|
Annual Production | 1,820
pieces
|
Production Hrs. Annual | 8,664
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $555,409 | 8,739,742 |
kWh
|
$0.064 |
Electricity Demand | $187,647 | 21,644 |
kW-mo/yr
|
$8.67 |
Natural Gas | $126,108 | 31,027 |
MMBtu
|
$4.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,539 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,380 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $25,681 | $7,454 | - | - | - | - |
$25,681
-
Tgal
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,189 | $9,625 |
$6,189
94,666
kWh
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,088 | $323 |
$2,088
31,946
kWh
|
- | - | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,686 | $3,400 |
$1,686
25,791
kWh
|
- | - | - | - | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $925 | $403 | - | - | - | - |
$925
-
Tgal
|
|
06 | 4.652: Replace existing equipment with more suitable substitutes | $65,920 | $385,000 |
$20,099
307,444
kWh
|
$41,333
-
kW-mo/yr
|
$(-2,337.0)
-
MMBtu
|
$6,825 | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,050 | $7,800 |
$1,050
16,120
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $103,539 | $414,005 |
$31,112
475,967
kWh
|
$41,333
-
kW-mo/yr
|
$(-2,337.0)
-
MMBtu
|
$6,825 |
$26,606
-
Tgal
|
||
TOTAL IMPLEMENTED | $30,380 | $11,580 |
$3,774
57,737
kWh
|
- | - | - |
$26,606
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs