ITAC Assessment: MA0412
ITAC logo
ITAC Assessment: MA0412
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Press fabrics
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range n/a
# of Employees 200
Plant Area 208,000
ft2
Annual Production 1,820
pieces
Production Hrs. Annual 8,664
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $555,409 8,739,742
kWh
Electricity Demand $187,647 21,644
kW-mo/yr
Natural Gas $126,108 31,027
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,539 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,380

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $25,681 $7,454 - - - - $25,681
-
Tgal
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,189 $9,625 $6,189
94,666
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $2,088 $323 $2,088
31,946
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,686 $3,400 $1,686
25,791
kWh
- - - -
05 3.4116: Meter recycled water (to reduce sewer charges) $925 $403 - - - - $925
-
Tgal
06 4.652: Replace existing equipment with more suitable substitutes $65,920 $385,000 $20,099
307,444
kWh
$41,333
-
kW-mo/yr
$(-2,337.0)
-
MMBtu
$6,825 -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,050 $7,800 $1,050
16,120
kWh
- - - -
TOTAL RECOMMENDED $103,539 $414,005 $31,112
475,967
kWh
$41,333
-
kW-mo/yr
$(-2,337.0)
-
MMBtu
$6,825 $26,606
-
Tgal
TOTAL IMPLEMENTED $30,380 $11,580 $3,774
57,737
kWh
- - - $26,606
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs