ITAC Assessment: ME0230
ITAC logo
ITAC Assessment: ME0230
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product PACKAGE MEATS
NAICS
n/a
SIC 2011: Meat Packing Plants
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 50,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 2,990
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,099 1,203,986
kWh
Electricity Demand $14,934 2,802
kW-mo/yr
Electricity Fees $1,521 -
LPG $11,826 1,359
MMBtu
Fuel Oil #2 $17,978 3,441
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,905 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,882 $10,074 $4,026
50,410
kWh
$1,856
-
kW-mo/yr
- - - -
02 2.8121: Apply for tax-free status for energy purchases $1,038 - - - - - $1,038 -
03 2.8121: Apply for tax-free status for energy purchases $2,022 - - - - - $2,022 -
04 2.1113: Reduce combustion air flow to optimum $973 $400 - - $973
-
MMBtu
- - -
05 2.6212: Turn off equipment during breaks, reduce operating time $636 $916 $502
6,155
kWh
$134
-
kW-mo/yr
- - - -
06 2.2511: Insulate bare equipment $560 $1,200 - - $560
-
MMBtu
- - -
07 2.6212: Turn off equipment during breaks, reduce operating time $379 - $343
4,982
kWh
$36
-
kW-mo/yr
- - - -
08 3.4115: Recover and reuse cooling water $3,346 $4,963 - - - $2,599
-
Tgal
- $747
-
Tgal
09 3.4115: Recover and reuse cooling water $1,624 $1,500 - - - $1,261
-
Tgal
- $363
-
Tgal
10 3.4115: Recover and reuse cooling water $445 $2,900 $(-82.0)
(-879)
kWh
- - $409
-
Tgal
- $118
-
Tgal
TOTAL RECOMMENDED $16,905 $21,953 $4,789
60,668
kWh
$2,026
-
kW-mo/yr
$1,533
-
MMBtu
$4,269
-
Tgal
$3,060 $1,228
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs