Assessment Year | 1997 |
---|---|
Principal Product | PACKAGE MEATS |
NAICS |
n/a
|
SIC | 2011: Meat Packing Plants |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
50,000
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 2,990
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $99,099 | 1,203,986 |
kWh
|
$0.082 |
Electricity Demand | $14,934 | 2,802 |
kW-mo/yr
|
$5.33 |
Electricity Fees | $1,521 | - |
|
- |
LPG | $11,826 | 1,359 |
MMBtu
|
$8.70 |
Fuel Oil #2 | $17,978 | 3,441 |
MMBtu
|
$5.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,905 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,882 | $10,074 |
$4,026
50,410
kWh
|
$1,856
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.8121: Apply for tax-free status for energy purchases | $1,038 | - | - | - | - | - | $1,038 | - | |
03 | 2.8121: Apply for tax-free status for energy purchases | $2,022 | - | - | - | - | - | $2,022 | - | |
04 | 2.1113: Reduce combustion air flow to optimum | $973 | $400 | - | - |
$973
-
MMBtu
|
- | - | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $636 | $916 |
$502
6,155
kWh
|
$134
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.2511: Insulate bare equipment | $560 | $1,200 | - | - |
$560
-
MMBtu
|
- | - | - | |
07 | 2.6212: Turn off equipment during breaks, reduce operating time | $379 | - |
$343
4,982
kWh
|
$36
-
kW-mo/yr
|
- | - | - | - | |
08 | 3.4115: Recover and reuse cooling water | $3,346 | $4,963 | - | - | - |
$2,599
-
Tgal
|
- |
$747
-
Tgal
|
|
09 | 3.4115: Recover and reuse cooling water | $1,624 | $1,500 | - | - | - |
$1,261
-
Tgal
|
- |
$363
-
Tgal
|
|
10 | 3.4115: Recover and reuse cooling water | $445 | $2,900 |
$(-82.0)
(-879)
kWh
|
- | - |
$409
-
Tgal
|
- |
$118
-
Tgal
|
|
TOTAL RECOMMENDED | $16,905 | $21,953 |
$4,789
60,668
kWh
|
$2,026
-
kW-mo/yr
|
$1,533
-
MMBtu
|
$4,269
-
Tgal
|
$3,060 |
$1,228
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs