Assessment Year | 1997 |
---|---|
Principal Product | Plastic Bottles |
NAICS |
n/a
|
SIC | 3085: Plastics Bottles |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
126,000
ft2
|
Annual Production | 350,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,008,297 | 17,457,503 |
kWh
|
$0.058 |
Electricity Demand | $282,273 | 29,932 |
kW-mo/yr
|
$9.43 |
Electricity Fees | $994 | - |
|
- |
Natural Gas | $48,241 | 6,387 |
MMBtu
|
$7.55 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,007 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $8,296 | $791 |
$8,296
143,611
kWh
|
- | - | |
02 | 2.4323: Use optimum size and capacity equipment | $2,846 | $900 |
$2,163
37,515
kWh
|
$683
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,321 | $9,750 |
$9,379
162,368
kWh
|
$2,942
-
kW-mo/yr
|
- | |
04 | 2.2612: Use cooling tower water instead of refrigeration | $4,656 | $3,770 |
$4,656
80,598
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,783 | $4,225 |
$3,783
49,824
kWh
|
- | - | |
06 | 2.7224: Reduce space conditioning during non-working hours | $947 | $520 | - | - |
$947
-
MMBtu
|
|
07 | 2.6232: Install set-back timers | $10,158 | $30,560 |
$10,158
175,850
kWh
|
- | - | |
TOTAL RECOMMENDED | $43,007 | $50,516 |
$38,435
649,766
kWh
|
$3,625
-
kW-mo/yr
|
$947
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs