ITAC Assessment: MA0360
ITAC logo
ITAC Assessment: MA0360
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product High energy beam processing
NAICS
n/a
SIC 3661: Telephone and Telegraph Apparatus
Sales Range $5
M
to 10
M
# of Employees 66
Plant Area 24,500
ft2
Annual Production 1,400,000
pieces
Production Hrs. Annual 6,370
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,867 2,237,691
kWh
Electricity Demand $99,406 6,364
kW-mo/yr
Electricity Fees $35,849 -
Natural Gas $8,734 950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,626 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $6,495 $6,679 - $6,495
-
MMBtu
-
02 2.7261: Install timers and/or thermostats $4,489 $4,452 - $4,489
-
MMBtu
-
03 2.2612: Use cooling tower water instead of refrigeration $1,904 $26,500 $1,904
41,618
kWh
- -
04 3.6192: Use a less expensive method of waste removal $420 - - - $420
-
gal
05 2.4221: Install compressor air intakes in coolest locations $318 $75 $318
4,396
kWh
- -
TOTAL RECOMMENDED $13,626 $37,706 $2,222
46,014
kWh
$10,984
-
MMBtu
$420
-
gal
TOTAL IMPLEMENTED $7,233 $6,754 $318
4,396
kWh
$6,495
-
MMBtu
$420
-
gal