Assessment Year | 1996 |
---|---|
Principal Product | High energy beam processing |
NAICS |
n/a
|
SIC | 3661: Telephone and Telegraph Apparatus |
Sales Range | $5 M to 10M |
# of Employees | 66 |
Plant Area |
24,500
ft2
|
Annual Production | 1,400,000
pieces
|
Production Hrs. Annual | 6,370
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $176,867 | 2,237,691 |
kWh
|
$0.079 |
Electricity Demand | $99,406 | 6,364 |
kW-mo/yr
|
$15.62 |
Electricity Fees | $35,849 | - |
|
- |
Natural Gas | $8,734 | 950 |
MMBtu
|
$9.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,626 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,233 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $6,495 | $6,679 | - |
$6,495
-
MMBtu
|
- | |
02 | 2.7261: Install timers and/or thermostats | $4,489 | $4,452 | - |
$4,489
-
MMBtu
|
- | |
03 | 2.2612: Use cooling tower water instead of refrigeration | $1,904 | $26,500 |
$1,904
41,618
kWh
|
- | - | |
04 | 3.6192: Use a less expensive method of waste removal | $420 | - | - | - |
$420
-
gal
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $318 | $75 |
$318
4,396
kWh
|
- | - | |
TOTAL RECOMMENDED | $13,626 | $37,706 |
$2,222
46,014
kWh
|
$10,984
-
MMBtu
|
$420
-
gal
|
||
TOTAL IMPLEMENTED | $7,233 | $6,754 |
$318
4,396
kWh
|
$6,495
-
MMBtu
|
$420
-
gal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs