ITAC Assessment: MA0350
ITAC logo
ITAC Assessment: MA0350
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Metal Stampings
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 299
Plant Area 110,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 5,380
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $388,564 3,404,748
kWh
Natural Gas $26,676 3,210
MMBtu
Fuel Oil #2 $3,365 785
MMBtu
Fuel Oil #4 $4,745 1,195
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,170 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,047

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #4 Savings Water Disposal Savings Water Consumption Savings
01 2.6232: Install set-back timers $18,981 $7,000 - $11,689
-
MMBtu
$3,124
-
MMBtu
$4,168
-
MMBtu
- -
02 2.1332: Convert combustion equipment to burn natural gas $15,250 $28,000 $19,394
125,147
kWh
$(-4,144.0)
-
MMBtu
- - - -
03 2.4239: Eliminate or reduce compressed air usage $6,705 $630 $6,705
77,960
kWh
- - - - -
04 2.2511: Insulate bare equipment $1,806 $870 $1,806
17,878
kWh
- - - - -
05 2.4221: Install compressor air intakes in coolest locations $1,260 $500 $1,260
14,654
kWh
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,118 $2,813 $1,118
10,551
kWh
- - - - -
07 3.4111: Use closed cycle process to minimize waste water production $1,050 $400 $(-212.0)
(-2,052)
kWh
- - - $901
-
Tgal
$361
-
Tgal
TOTAL RECOMMENDED $46,170 $40,213 $30,071
244,138
kWh
$7,545
-
MMBtu
$3,124
-
MMBtu
$4,168
-
MMBtu
$901
-
Tgal
$361
-
Tgal
TOTAL IMPLEMENTED $22,047 $8,370 $3,066
32,532
kWh
$11,689
-
MMBtu
$3,124
-
MMBtu
$4,168
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Fuel Oil #4 Savings Water Disposal Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs