Assessment Year | 1994 |
---|---|
Principal Product | flexible and no-flexible stainless and galvanized steel cabl |
NAICS |
n/a
|
SIC | 2298: Cordage and Twine |
Sales Range | $10 M to 50M |
# of Employees | 117 |
Plant Area |
150,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $464,871 | 5,566,237 |
kWh
|
$0.084 |
Fuel Oil #2 | $23,394 | 4,720 |
MMBtu
|
$4.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,896 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,228 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $48,128 | $7,677 |
$48,128
505,276
kWh
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $11,136 | $10,870 |
$14,370
172,040
kWh
|
$(-3,234.0)
-
MMBtu
|
|
03 | 2.2443: Re-use or recycle hot or cold process exhaust air | $6,909 | $20,205 | - |
$6,909
-
MMBtu
|
|
04 | 2.2628: Utilize a less expensive cooling method | $3,525 | $7,280 |
$3,525
42,204
kWh
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,714 | - |
$1,714
20,516
kWh
|
- | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,786 | $1,786 |
$1,786
12,896
kWh
|
- | |
07 | 2.2511: Insulate bare equipment | $881 | $121 |
$881
10,551
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $514 | $644 |
$514
6,155
kWh
|
- | |
09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $303 | $688 | - |
$303
-
MMBtu
|
|
TOTAL RECOMMENDED | $74,896 | $49,271 |
$70,918
769,638
kWh
|
$3,978
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,228 | $644 |
$2,228
26,671
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs