ITAC Assessment: MA0296
ITAC logo
ITAC Assessment: MA0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product flexible and no-flexible stainless and galvanized steel cabl
NAICS
n/a
SIC 2298: Cordage and Twine
Sales Range $10
M
to 50
M
# of Employees 117
Plant Area 150,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $464,871 5,566,237
kWh
Fuel Oil #2 $23,394 4,720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,896 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.2437: Recover waste heat from equipment $48,128 $7,677 $48,128
505,276
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $11,136 $10,870 $14,370
172,040
kWh
$(-3,234.0)
-
MMBtu
03 2.2443: Re-use or recycle hot or cold process exhaust air $6,909 $20,205 - $6,909
-
MMBtu
04 2.2628: Utilize a less expensive cooling method $3,525 $7,280 $3,525
42,204
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,714 - $1,714
20,516
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,786 $1,786 $1,786
12,896
kWh
-
07 2.2511: Insulate bare equipment $881 $121 $881
10,551
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $514 $644 $514
6,155
kWh
-
09 2.7447: Install vinyl strip / high speed / air curtain doors $303 $688 - $303
-
MMBtu
TOTAL RECOMMENDED $74,896 $49,271 $70,918
769,638
kWh
$3,978
-
MMBtu
TOTAL IMPLEMENTED $2,228 $644 $2,228
26,671
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs