Assessment Year | 1993 |
---|---|
Principal Product | Custom thermoformed part |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $500 k to 1M |
# of Employees | 9 |
Plant Area |
10,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 2,112
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $30,753 | 217,175 |
kWh
|
$0.14 |
Fuel Oil #2 | $2,986 | 484 |
MMBtu
|
$6.17 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $11,047 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,368 | $6,769 |
$4,368
-
kWh
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,602 | $10,000 |
$4,037
28,429
kWh
|
$(-435.0)
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,660 | $113 |
$1,660
11,723
kWh
|
- | |
04 | 2.6232: Install set-back timers | $324 | $64 |
$324
3,810
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $429 | $602 |
$429
2,931
kWh
|
- | |
06 | 2.2511: Insulate bare equipment | $415 | $160 |
$415
2,931
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $249 | $136 |
$249
1,758
kWh
|
- | |
TOTAL RECOMMENDED | $11,047 | $17,844 |
$11,482
51,582
kWh
|
$(-435.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs