ITAC Assessment: MA0280
ITAC logo
ITAC Assessment: MA0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Custom thermoformed part
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $500
k
to 1
M
# of Employees 9
Plant Area 10,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,112
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,753 217,175
kWh
Fuel Oil #2 $2,986 484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,047 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,368 $6,769 $4,368
-
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,602 $10,000 $4,037
28,429
kWh
$(-435.0)
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,660 $113 $1,660
11,723
kWh
-
04 2.6232: Install set-back timers $324 $64 $324
3,810
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $429 $602 $429
2,931
kWh
-
06 2.2511: Insulate bare equipment $415 $160 $415
2,931
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $249 $136 $249
1,758
kWh
-
TOTAL RECOMMENDED $11,047 $17,844 $11,482
51,582
kWh
$(-435.0)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs