| Assessment Year | 1993 |
|---|---|
| Principal Product | Custom thermoformed part |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $500 k to 1M |
| # of Employees | 9 |
| Plant Area |
10,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 2,112
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $30,753 | 217,175 |
kWh
|
$0.14 |
| Fuel Oil #2 | $2,986 | 484 |
MMBtu
|
$6.17 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,047 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,368 | $6,769 |
$4,368
-
kWh
|
- | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,602 | $10,000 |
$4,037
28,429
kWh
|
$(-435.0)
-
MMBtu
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,660 | $113 |
$1,660
11,723
kWh
|
- | |
| 04 | 2.6232: Install set-back timers | $324 | $64 |
$324
3,810
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $429 | $602 |
$429
2,931
kWh
|
- | |
| 06 | 2.2511: Insulate bare equipment | $415 | $160 |
$415
2,931
kWh
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $249 | $136 |
$249
1,758
kWh
|
- | |
| TOTAL RECOMMENDED | $11,047 | $17,844 |
$11,482
51,582
kWh
|
$(-435.0)
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs