| Assessment Year | 1992 |
|---|---|
| Principal Product | ADJUSTABLE RETAINING DEVICES |
| NAICS |
n/a
|
| SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
| Sales Range | $1 M to 5M |
| # of Employees | 38 |
| Plant Area |
n/a
|
| Annual Production | 1,400,000
pieces
|
| Production Hrs. Annual | 2,375
hrs
|
| Location (State) | Rhode Island |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $41,680 | 345,545 |
kWh
|
$0.12 |
| Fuel Oil #2 | $7,019 | 149,520 |
MMBtu
|
$0.047 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,259 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $767 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,096 | - |
$1,096
9,086
kWh
|
- | - | |
| 02 | 2.2511: Insulate bare equipment | $954 | $314 |
$954
7,913
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $590 | $1 |
$628
5,275
kWh
|
- | $(-38.0) | |
| 04 | 2.6232: Install set-back timers | $813 | $592 |
$813
6,741
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $177 | $145 |
$177
1,465
kWh
|
- | - | |
| 06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,629 | - |
$2,156
17,878
kWh
|
$(-527.0)
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $5,259 | $1,052 |
$5,824
48,358
kWh
|
$(-527.0)
-
MMBtu
|
$(-38.0) | ||
| TOTAL IMPLEMENTED | $767 | $146 |
$805
6,740
kWh
|
- | $(-38.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs